An office is judged every working day by the people inside it. It has to attract and keep talent, support the way teams actually work, run efficiently, and meet the standards of a parent company that may be on another continent. We bring the same discipline we apply to mission-critical buildings to the workplace: one team from building selection to move-in, services designed with the architecture, and green certification built into the design rather than added at the end.
Everything between the lease and the first working day.
Clients can commission a single stage, such as a building assessment before a lease is signed, or the complete delivery of a fitted, certified workplace ready for occupation. Each stage hands over a documented record, so nothing is lost between advisers.
Building assessment
Technical due diligence before a lease is signed: structure, floor plates, MEP capacity, power backup, fire safety, accessibility and the landlord’s obligations.
Workplace strategy
Headcount and growth, hybrid working patterns, space standards and the balance of focus, collaboration and amenity space, tested through layout options.
Interior architecture
Planning, interiors, finishes, furniture, acoustics, wayfinding and brand expression, drawn to the same complete-set standard as our other buildings.
MEPF and IT infrastructure
HVAC, lighting and power, backup for critical rooms, fire detection and suppression, server and hub rooms, structured cabling, access control and BMS.
Approvals
Fire NOC, occupancy and the statutory consents the fit-out requires, plus SEZ and STPI procedures where the tenancy falls under them.
Turnkey fit-out
Procurement on a documented portal, construction management, commissioning, snagging and a managed move-in, under one contract if the client prefers.
What a GCC needs that an ordinary office does not.
A global capability centre carries the expectations of its parent company into a new building, often on a fixed date set from abroad. The design has to satisfy a global design guide, a security team and an ESG function that reports to headquarters, as well as the people who will work there.
| Requirement | What it means for the building | How we address it |
|---|---|---|
| Parent-company standards | Global design guides for space, finishes, IT and safety | Guides mapped to Indian codes at the brief, with deviations agreed before design |
| Security and segregation | Secure zones and offshore development centres separated from shared space | Layered access control, CCTV and zoning designed with the client’s security team |
| Business continuity | Operations that cannot stop for a power or network failure | Backup power for critical rooms, diverse network entries and resilient hub rooms |
| Speed to occupation | A go-live date fixed by the parent company | Parallel design and procurement, long-lead items ordered early, a single site team |
| Talent and wellbeing | Workplaces that compete for scarce skills | Daylight, fresh air, acoustics, amenity and collaboration space planned in |
| ESG reporting | Data the headquarters can include in group disclosures | LEED or IGBC certification and metered energy and water, see Green buildings and ESG |
Seven stages, brief to move-in.
Every workplace project follows the same sequence, with a defined output at each stage and the programme reported weekly.
Brief and site
Headcount, growth, ways of working, parent standards and the assessment of candidate buildings.
OutputWorkplace brief and building reportTest fits
Layout options on each candidate floor plate, showing capacity, adjacencies and the cost of each option.
OutputTest-fit drawings and capacity scheduleConcept design
Planning, look and feel, services strategy and green certification targets, agreed with the client.
OutputConcept design and certification scorecardDetailed design
Interiors and MEPF drawn as a complete, coordinated set, with bills of quantities keyed to the drawings.
OutputIssued drawings and BOQsProcurement
Tenders for fit-out, furniture and equipment, evaluated against the specification with at least three bids.
OutputOrders and programmeFit-out
Construction management, quality and safety on site, with progress reported weekly.
OutputProgress recordCommissioning and move-in
Testing of every system, snagging, certification documentation and a managed move-in.
OutputHandover recordThinking from the practice.
Short perspectives from our engineers on the decisions that shape a building.

Why 800 VDC takes the UPS room out of the building
Single conversion from 33 kV to the rack removes rooms, losses and a fire risk, and lets density change without new panels.

Renewable power should be measured by the hour
Annual renewable claims hide the night. Hourly matching shows what a data centre actually runs on.

Planning a site for 3.5-tonne racks
Rack-scale AI changes the ground study, the structure and every route from the loading dock to the hall.
Planning a new office or GCC?
Send the city, the headcount and the date you need to be in. We will set out the stages, the programme and the team.