HyperNext Consulting Service · A proud member of HyperNext Group
Overview

A green building is decided in the design, not in the certificate. Orientation, landscape, envelope, services and materials set its energy, water and comfort performance for decades. We integrate green design from the first sketch, carry LEED or IGBC documentation alongside the drawings, and turn the building’s performance into the data an ESG report needs.

CS-502.1Green space designSection A

Six areas of performance, designed together.

Green design is most effective, and least expensive, when every discipline works to the same targets from the start. We set those targets at the brief and test them against energy and daylight models as the design develops.

G1Site

Landscape and green space

Native and adaptive planting, shaded outdoor space, permeable surfaces, heat-island reduction and rainwater harvesting designed into the site.

G2Envelope

Daylight and facade

Orientation, glazing and shading tuned for daylight without glare or solar gain, checked by daylight and thermal simulation.

G3Energy

Efficient systems

Efficient HVAC and lighting, controls and metering, on-site and procured renewable energy, verified by whole-building energy modelling.

G4Water

Water and wastewater

Low-flow fixtures, treated water reused for flushing and landscape, and zero liquid discharge where the site allows.

G5Materials

Materials and waste

Low-carbon and recycled-content materials, regional sourcing, construction waste diversion and a plan for end-of-life recovery.

G6Comfort

Indoor environment

Fresh air, CO₂ monitoring, low-emitting materials, thermal and acoustic comfort, and views to the outside.

CS-502.2CertificationSection B

LEED and IGBC, from scorecard to certificate.

We act as certification consultant for new buildings, interiors and existing buildings, including data centres. The work begins with a scorecard that sets a realistic target level, continues through design and construction with documentation kept alongside the drawings, and ends with submission and responses to reviewer queries.

SystemRating routes we supportLevels
LEEDBuilding Design and Construction, including data centres; Interior Design and Construction for office fit-outs; Operations and Maintenance for existing buildingsCertified, Silver, Gold, Platinum
IGBCGreen New Buildings; Green Interiors for office fit-outs; Green Existing Buildings; Green Data CentresCertified, Silver, Gold, Platinum
GB-01

Scorecard

A credit-by-credit assessment of what the project can achieve, with cost and programme implications.

OutputTarget level and scorecard
GB-02

Integrated design

Targets written into the brief of every discipline, tested by energy, daylight and water modelling.

OutputDesign compliance report
GB-03

Construction

Material submittals, waste and pollution control, and site records kept to the rating system’s requirements.

OutputConstruction documentation
GB-04

Commissioning

Systems tested against the design intent, with enhanced commissioning where the target level requires it.

OutputCommissioning report
GB-05

Submission

Documentation submitted, reviewer queries answered, and the certificate secured.

OutputCertification
CS-502.3ESG consultingSection C

From building performance to the ESG report.

Owners, occupiers and global capability centres are asked for evidence of their environmental performance by boards, investors, regulators and parent companies. We measure what the buildings use, set credible targets, and prepare the data and narrative the disclosures require.

  1. Carbon footprintBaseline emissions across Scopes 1, 2 and 3, with the methodology documented.
  2. Net zero roadmapReduction targets and a costed pathway through efficiency, renewables and procurement.
  3. Reporting supportData and narrative for BRSR, GRI-aligned sustainability reports and parent-company disclosures.
  4. Energy and water auditsMetered analysis of existing buildings, with measures ranked by cost and saving.
  5. Renewable procurementSupply arranged and matched by the hour, see Green power arrangement.
  6. Waste and circularityConstruction waste diversion and equipment recovery planned at the outset.
Start a project

Aiming for LEED or IGBC?

Send the building type, its stage and the level you have in mind. We will return a scorecard and a realistic target.

ReplyWithin one working day, from an engineer
OfficesMumbai · Bangalore · Ahmedabad · Toronto
PracticeHyperNext Consulting Service, a proud member of HyperNext Group