HyperNext Consulting Service · A proud member of HyperNext Group
Working here

Our people work on buildings where performance matters most. Data centres, offices for global capability centres and certified green buildings demand the same discipline: architects learn the services, engineers learn the architecture, and everyone sees a project through from the first survey to the last commissioning test, rather than handing it on at the end of a stage.

Disciplines

Who we are looking for.

We recruit across every discipline a data centre needs. Experience of mission-critical buildings is valuable; the willingness to work to an exacting standard matters more.

01

Architects

Master plans, building sets drawn floor by floor, and facades developed with the services strategy.

02

Electrical engineers

High and medium voltage, 800 VDC and AC distribution, earthing and protection.

03

Mechanical engineers

Liquid cooling, glycol loops, dry coolers, CDU rooms and air management.

04

Fire and plumbing engineers

Detection, gas suppression, pre-action sprinklers, water and drainage.

05

Power system and CFD analysts

Studies in PowerStudio and CFD Studio, our own analysis software.

06

Procurement and site leads

Tenders on HyperNext One, our vendor management platform, inspection, construction management and commissioning.

The practice engineering office
How we work

One standard, learned once, used everywhere.

New colleagues learn a single design and drawing standard that applies to every project the practice issues, and they work alongside the discipline leads who wrote it.

How we work

Start a project

Interested in joining us?

See the open roles across HyperNext Group, or write to us with your discipline and experience.

ReplyWithin one working day, from an engineer
OfficesMumbai · Bangalore · Ahmedabad · Toronto
PracticeHyperNext Consulting Service, a proud member of HyperNext Group