Overview

Every project we deliver moves through eleven stages, each with a defined output agreed before the stage begins. A client may stop after any of them and hold a complete, documented record that another team can build on, or carry the project through every stage with the same people who began it.

CS-401.1Project stagesStudy · Design · Deliver
01 · CS-101

Ground study

Site comparison, topographic and geotechnical survey, hydrology, soil resistivity, utilities and fibre, recorded before any commitment.

OutputSite report and survey drawings
02 · CS-102

Feasibility model

Programme, architecture, capital and operating cost, revenue, financing and returns, tested against the assumptions most likely to be wrong.

OutputOpen Excel model and report
03 · CS-103

Power procurement

Load application and connection, an hourly demand model and the optimised supply mix, taken to contract.

OutputConnection route and supply agreements
04 · CS-104

Green power

Captive renewables, storage, wheeling and banking, arranged to meet the client’s renewable share hour by hour.

OutputRenewable supply plan
05 · CS-201

Master plan

Plots, phasing, shared intake, utility corridors, fibre routes and security, drawn to building-set standard and issued final.

OutputMaster plan set, DXF and PDF
06 · CS-202

Design and MEPF

The complete architectural set, then every services package on it, coordinated floor by floor, with the BMS designed alongside.

OutputDXF and PDF per package, BOQs in Excel
07 · CS-304

Approvals

Run in parallel from the feasibility stage onward, filed from the same drawing set the contractor will build.

OutputConsents and approvals register
08 · CS-301

Procurement

Tenders on HyperNext One, at least three bids per order, third-party audit and in-house inspection before purchase.

OutputPurchase orders and inspection records
09 · CS-303

Prefabrication and build

Services skids manufactured while the structure rises, then installed in place under one site team.

OutputProgramme and progress record
10 · CS-303

Infrastructure fit-out

Containment, power, liquid cooling, fibre and monitoring brought to every rack position in each hall.

OutputHalls ready for load
11 · CS-303

Commissioning and handover

Factory, site and integrated systems tests, followed by as-built records, training and handover to operations.

OutputTest certificates and handover record
CS-401.2PrinciplesSection B

Three rules we do not bend.

These principles are written into every appointment we accept.

P1

Final at first issue

Coordination, codes and prefabrication needs are resolved before a drawing leaves the office, so there are no revisions at later stages, including the skid drawings.

P2

Open to every supplier

Vendor-neutral specifications, no brand names on drawings and no prices on vendor sheets, so that competition sets the price.

P3

Client files stay with us

Our studies run on our own machines, and every portal download carries an ID and a watermark, so drawings do not drift.

CS-401.3TeamSection C
An open-plan engineering office
Fig. 01  Engineering officeNTS
Who leads

One project director, from the first survey to the last test.

Every appointment has a single project director who remains responsible from brief to handover, supported by discipline leads for architecture, electrical, mechanical, fire and plumbing, low voltage and BMS, power procurement, approvals and site. The client always knows who is accountable, and that person does not change between stages.

Drawings, bills of quantities and approvals are shared on HyperNext One, where the client reviews and approves them in the same way vendors do, and programme and progress are reported weekly.

CS-401.4Questions
Can we join at a later stage?
Yes. We can review an existing design, take over procurement or manage the build and fit-out from wherever the project stands. We first check what exists against our standard and tell you plainly what it needs.
Which standards do you design to?
In India, the BIS and IS codes, the National Building Code and the CEA regulations, each at the highest class it offers. Outside India, the local codes, with the same internal standard applied on top.
How long does each stage take?
It depends on the site, the scale and the authorities involved. We set out the programme for every stage in the proposal and report against it weekly once the work begins.
Start a project

The first stage is a conversation.

Send a short brief. We will reply with the stages your project needs, the outputs of each and the team who will deliver them.

ReplyWithin one working day, from an engineer
OfficesMumbai · Bangalore · Ahmedabad · Toronto
PracticeHyperNext Consulting Service, a proud member of HyperNext Group