Every project we deliver moves through eleven stages, each with a defined output agreed before the stage begins. A client may stop after any of them and hold a complete, documented record that another team can build on, or carry the project through every stage with the same people who began it.
Ground study
Site comparison, topographic and geotechnical survey, hydrology, soil resistivity, utilities and fibre, recorded before any commitment.
OutputSite report and survey drawingsFeasibility model
Programme, architecture, capital and operating cost, revenue, financing and returns, tested against the assumptions most likely to be wrong.
OutputOpen Excel model and reportPower procurement
Load application and connection, an hourly demand model and the optimised supply mix, taken to contract.
OutputConnection route and supply agreementsGreen power
Captive renewables, storage, wheeling and banking, arranged to meet the client’s renewable share hour by hour.
OutputRenewable supply planMaster plan
Plots, phasing, shared intake, utility corridors, fibre routes and security, drawn to building-set standard and issued final.
OutputMaster plan set, DXF and PDFDesign and MEPF
The complete architectural set, then every services package on it, coordinated floor by floor, with the BMS designed alongside.
OutputDXF and PDF per package, BOQs in ExcelApprovals
Run in parallel from the feasibility stage onward, filed from the same drawing set the contractor will build.
OutputConsents and approvals registerProcurement
Tenders on HyperNext One, at least three bids per order, third-party audit and in-house inspection before purchase.
OutputPurchase orders and inspection recordsPrefabrication and build
Services skids manufactured while the structure rises, then installed in place under one site team.
OutputProgramme and progress recordInfrastructure fit-out
Containment, power, liquid cooling, fibre and monitoring brought to every rack position in each hall.
OutputHalls ready for loadCommissioning and handover
Factory, site and integrated systems tests, followed by as-built records, training and handover to operations.
OutputTest certificates and handover recordThree rules we do not bend.
These principles are written into every appointment we accept.
Final at first issue
Coordination, codes and prefabrication needs are resolved before a drawing leaves the office, so there are no revisions at later stages, including the skid drawings.
Open to every supplier
Vendor-neutral specifications, no brand names on drawings and no prices on vendor sheets, so that competition sets the price.
Client files stay with us
Our studies run on our own machines, and every portal download carries an ID and a watermark, so drawings do not drift.

One project director, from the first survey to the last test.
Every appointment has a single project director who remains responsible from brief to handover, supported by discipline leads for architecture, electrical, mechanical, fire and plumbing, low voltage and BMS, power procurement, approvals and site. The client always knows who is accountable, and that person does not change between stages.
Drawings, bills of quantities and approvals are shared on HyperNext One, where the client reviews and approves them in the same way vendors do, and programme and progress are reported weekly.
Can we join at a later stage?
Which standards do you design to?
How long does each stage take?
The first stage is a conversation.
Send a short brief. We will reply with the stages your project needs, the outputs of each and the team who will deliver them.