A good office campus is remembered for its spaces between buildings as much as for the buildings themselves. The master plan decides how much can be built, where each building stands and how it faces the sun, how people arrive and move about, where they meet, eat and rest, and how the campus grows as headcount grows. We plan the whole campus at the start, then deliver it phase by phase, with each phase complete, working and pleasant to be in.

CS-503.1What the plan coversSection A

Nine questions every campus must answer.

The answers become the master plan drawings and the design guidelines that every building on the campus follows. For the fit-out of the buildings themselves, see Offices and GCCs.

O1Potential

Development potential

Zoning, floor space index, set-backs, height limits and transferable rights, and what they allow on the plot.

O2Placement

Buildings and orientation

Building footprints and heights placed for daylight, shade, prevailing wind, views and the separation between them.

O3Growth

Phasing

A sequence that follows headcount, with each phase complete in its roads, services and amenity.

O4Movement

Arrival and mobility

Public transport links, shuttles, drop-off, parking, EV charging, cycling and shaded pedestrian routes.

O5Landscape

Open space and landscape

Courtyards, gardens and plazas, native planting, rainwater harvesting and heat-island reduction.

O6Amenity

Amenity

Food courts, conference and training centres, fitness, health, childcare and places to meet informally.

O7Services

Campus infrastructure

Power and substation, district cooling, water, sewage treatment, waste and campus IT networks.

O8Security

Security and zoning

Public, shared and secure zones, with separate routes for visitors, staff, deliveries and secure development centres.

O9Green

Green certification

A master plan aligned with LEED and IGBC rating systems for campuses and townships. See Green buildings and ESG.

CS-503.2MethodSection B

Six stages, from brief to design guidelines.

Each stage is reviewed with the client’s real estate, workplace, facilities and ESG teams, so the plan reflects how the campus will actually be used and run.

OM-01

Brief

Headcount today and at full build, ways of working, amenity, parent-company standards and the budget envelope.

OutputCampus brief
OM-02

Site and regulations

Survey, ground, access, utilities, climate and the development controls that govern the plot.

OutputSite and regulations report
OM-03

Concept options

Alternative arrangements of buildings, open space and movement, compared on area, phasing and experience.

OutputConcept options
OM-04

Master plan

The preferred option developed into a master plan with building envelopes, landscape and mobility.

OutputMaster plan drawings
OM-05

Infrastructure and landscape

Roads, services and landscape designed for the full campus and set out phase by phase.

OutputInfrastructure and landscape plans
OM-06

Guidelines and approvals

Layout approval, environmental clearance and the design guidelines each building must follow.

OutputApproved plan and guidelines
Start a project

Planning an office campus?

Send the site, the headcount you are planning for and the first move-in date. We will return a first layout and a phasing plan.

ReplyWithin one working day, from an engineer