Land, power, capital and customers are seldom held by the same party. We bring design, supply chain, go-to-market and operations to whoever holds the rest, in a structure suited to the project, from a review of another team’s drawings to a joint venture in which both parties share the outcome.
Six ways to work with us, by depth.
Each model has a defined scope, a defined handover and a defined responsibility. They can be combined, and a client may move from one to the next as a project matures, for example from an owner’s engineer appointment to design and procurement once the feasibility case is proven.
| Model | Our scope | Client retains |
|---|---|---|
| EM-01 Owner’s engineer | Review and approval of another team’s design, tenders and site work on the client’s behalf | Design and construction contracts |
| EM-02 Design only | The complete architectural and MEPF set, issued final, for the client’s contractor | Procurement and construction |
| EM-03 Design and procure | Design, then tenders on HyperNext One through to inspected delivery on site | Construction contract |
| EM-04 Turnkey | Design, procurement, prefabrication, construction, fit-out, testing and commissioning under one contract | Ownership and operation |
| EM-05 Operate | Operation by our security and network operations teams after handover, or training of the client’s own team | Ownership |
| EM-06 Joint venture | Design, supply chain, customers and operations, alongside land or power from the partner | A shared stake in the venture |

The whole platform, not a design fee.
A joint venture with us receives a complete delivery and operating capability rather than a design fee. The partner contributes what it already holds, typically land, a grid connection or capital, and the venture is structured so that each side is responsible for the part it understands best.
- Design and developmentAn 80-person in-house team and a single documented standard.
- Supply chainThree-year fixed price contracts and priority allocation on critical equipment.
- CreditManufacturer credit lines that can be extended to the joint venture.
- CustomersA data centre go-to-market and channel-partner network already in place.
- OperationsIn-house security and network operations from the first day.
- PowerRenewable supply from the group’s own plants.
Built with the best.
Our technology partners work with us on client projects, and their systems are specified on client projects where they suit the requirement.
Sovereign cloud
Hyper 7 runs on IBM Sovereign Core, with code and control built, tested and certified in India.
Rack-scale AI
Rack-scale AMD Helios systems, specified with the power, cooling and floor loading they need.
Grid to rack
The 33 kV medium-voltage solid-state transformer that removes the conventional transformer from the building.
Thinking from the practice.
Short perspectives from our engineers on the decisions that shape a data centre.

Why 800 VDC takes the UPS room out of the building
Single conversion from 33 kV to the rack removes rooms, losses and a fire risk, and lets density change without new panels.

Renewable power should be measured by the hour
Annual renewable claims hide the night. Hourly matching shows what a data centre actually runs on.

Planning a site for 3.5-tonne racks
Rack-scale AI changes the ground study, the structure and every route from the loading dock to the hall.
Hold the land? Let us talk.
Tell us what you hold, whether land, power, capital or customers. We will propose the structure that fits it.