Our building management system was written in-house because no off-the-shelf product could follow an 800 VDC power chain, a liquid cooling loop and a tenant’s service levels in the same view. It is vendor-neutral, reads equipment from any approved manufacturer, and is designed alongside the building rather than added after it, so that every sensor, meter and alarm has a place in the drawings and a line in the bill of quantities.
Every system that keeps the hall running.
The system is organised by the way an operator thinks about a data centre: power, cooling, environment, safety and service. Each area has its own screens and its own alarm rules, and each is tied to the rooms, racks and tenants it serves, so that an event is always reported in terms of who it affects.
Intake to rack
High-voltage intake, solid-state conversion, 800 VDC distribution, rack power panels, breakers, battery modules and generators, with energy measured at every level.
Plant, loop and CDU
Dry coolers, pumps, CDUs, supply and return temperatures, flow and pressure across the glycol loop, and the efficiency of the plant in real time.
Inline fluid quality
Temperature, flow, density, glycol concentration, purity and pH read as the coolant passes, with a projection of its remaining life.
Rooms and racks
Temperature and humidity in halls and plant rooms, leak detection under every liquid pipe, and differential pressure where air is still used.
Fire and security
Fire detection and suppression status, access control events and CCTV integration, reported alongside the plant they protect.
Tenants and SLAs
Availability and reliability for each tenant, events against their service levels, and monthly reports produced from the same data the operators see.

Coolant changed when it needs changing, and not before.
In a liquid-cooled building the coolant is as critical as the power. An inline valve on the dry-cooler loop reads the fluid as it flows past and the BMS projects how many days of service it has left, so that it is replaced on condition rather than on a fixed schedule. The same screen shows inlet and outlet readings for each building, with alarms set well before any value reaches its limit.
How the system is put together.
The BMS is specified at the design stage and delivered with the building. Field devices are chosen on open protocols so that the system is never tied to a single manufacturer, and every point is named to a convention that matches the drawing tags, so that an alarm on screen leads straight to the item on the drawing and the line in the bill of quantities.
- Vendor-neutralEquipment from any manufacturer on the HyperNext approved brands register, read over open protocols such as BACnet, Modbus and SNMP.
- Digital twinA three-dimensional, rack-level model running alongside the building, for what-if and service-level simulation before a change is made.
- Live by defaultReadings pushed to screens as they change rather than polled, so that operators see events as they happen.
- Alarm escalationNotifications by email, webhook and SMS, escalated to the operations centre according to severity and time of day.
- Operations centreIntegrated with the network and security operations centres, including the console for on-campus denial-of-service scrubbing.
- Tags match drawingsPoint names follow the drawing and BOQ tags, so the record is consistent from design through to operation.
| Ref | Deliverable | Stage |
|---|---|---|
| BM-01 | BMS design basis: systems, points, protocols and alarm philosophy | Concept design |
| BM-02 | Points schedule in Excel, tagged to drawings and the bill of quantities | Detailed design |
| BM-03 | Network architecture and field device layouts in the LV package | Detailed design |
| BM-04 | Graphics, dashboards and digital twin built from the issued drawings | Construction |
| BM-05 | Point-to-point testing and integrated systems test with the plant | Commissioning |
| BM-06 | Operator training, alarm procedures and handover to the operations centre | Handover |
Thinking from the practice.
Short perspectives from our engineers on the decisions that shape a data centre.

Why 800 VDC takes the UPS room out of the building
Single conversion from 33 kV to the rack removes rooms, losses and a fire risk, and lets density change without new panels.

Renewable power should be measured by the hour
Annual renewable claims hide the night. Hourly matching shows what a data centre actually runs on.

Planning a site for 3.5-tonne racks
Rack-scale AI changes the ground study, the structure and every route from the loading dock to the hall.
See the whole building.
Tell us about the facility, new or existing. We will set out what the BMS should monitor and how it connects to the plant you have.
