A building is defined by the work and the owner it serves. A data centre is governed by its workload, an office by the people who use it. The same practice standard applies to every project, but the decisions that matter most change from market to market, and the brief is written to put those decisions first.

Market

Hyperscale campuses.

Hyperscale tenants are governed by power certainty and speed to capacity, and they increasingly expect the building to follow their own reference design. We secure the allocation and connection for the final campus at the feasibility stage, design halls to the tenant’s requirements, and shorten the programme with prefabricated services and drawings that are final at first issue.

For hyperscalers

Market

AI and rack-scale halls.

Rack-scale systems change power, cooling and structure at once. Racks of 100 kW to 600 kW need direct-to-chip liquid cooling, distribution that can grow without rewiring, and floors and routes designed for racks weighing up to 3.5 tonnes. We specify 800 VDC distribution without UPS, dedicated CDU rooms in every hall and floor loading of 2,800 kg/m².

Technology assistance

Market

Enterprise and banking.

Captive facilities for banks and large enterprises are judged on resilience and on the evidence behind it. We design to Tier IV practice, with gas suppression rooms on opposite sides of each hall, pre-action sprinklers and fully documented testing and commissioning, so that an auditor or a regulator can follow every decision from brief to handover.

Design and MEPF

Market

Disaster recovery.

A recovery site is chosen for what it does not share with the primary: grid, seismic zone, flood plain and fibre route. We weight site selection accordingly, model active-active against standby operation in the feasibility study, and design the network for physical diversity from the first survey.

Site and ground study

Market

Government and sovereign.

State and national facilities need data, keys and operators kept within the country, procurement that will stand up to public scrutiny, and security designed in layers from the boundary to the hall. We run tenders on a documented portal with at least three bids, third-party audit and inspection before purchase, and specify sovereign cloud platforms where they are required.

Procurement

Market

Data centre parks.

A park places several buildings, often for several tenants, behind one intake and one security line. Its value is fixed at the master plan: where the substation stands, how the corridors run and how each later building connects without disturbing those already in service. We plan the park once and design its common blocks as a standard set.

Data centre parks

Market

Colocation and wholesale.

Multi-tenant buildings must suit tenants who have not yet signed. We design halls that can move between retail and wholesale use, model each leasing form in the feasibility study, and keep operating cost low through efficient power and cooling and a building management system that reports service levels by tenant.

Feasibility study model

Market

Retrofit and upgrade.

Many existing facilities need more density than they were built for. We survey what is there, design liquid cooling and higher-capacity distribution around the live load, and fit out hall by hall so that operation continues throughout. Where the building cannot support the change, the survey says so before money is spent.

Build-outs and fit-out

Market

Offices and GCCs.

Companies and global capability centres need workplaces that attract talent, run efficiently and meet the standards of a parent company abroad. We select and assess buildings, plan the workplace, design the interiors and services, and deliver the fit-out turnkey, with LEED or IGBC certification built into the design rather than added at the end.

Offices and GCCs

Market

Solar and storage.

Industrial, commercial and data centre owners want lower energy cost and a higher renewable share, with supply they can rely on. We build on-site and captive solar plants under one EPC contract, add battery storage sized to the load and the tariff, and arrange the open access, wheeling and banking that carry captive power to the consumer.

Solar EPC   Battery energy storage

Start a project

Tell us which market you are in.

Send the workload, the scale and the region. We will tell you how we would approach it and who would lead it.