A data centre park places several buildings on one site behind a common intake, a common security line and a common set of utility corridors. Its value depends on decisions that are taken once, at the master plan, and then lived with for decades: where the substation stands, how the corridors run, which routes the fibre takes and how each later building connects without disturbing those already in service.

In figures
Master plan9Elements settled before the first building
Commercial models5From powered land to colocation
Security lines4Park, gate, building and hall
Fibre entries2+Physically separate routes into the park
CS-201.1Master planSection A

The elements a park master plan must settle.

The master plan is drawn to the same standard as a building set: fully dimensioned, on the surveyed coordinate system, with levels, sections through the corridors and a phasing sequence that shows what is built, energised and occupied at each stage. It is the document every later building is designed against, and it is issued final, so that the first building does not compromise the sixth.

A1Plots

Building pads and phasing

Plot sizes for each building type, setbacks, height envelopes and the order in which plots are developed, so that construction never crosses an operating building.

A2Power

Shared high-voltage intake

One substation sized for the final park, with a 33 kV ring or radial network to each building and space reserved for every future feeder.

A3Corridors

Utility corridors

Cable trenches, duct banks, water and drainage mains in dedicated corridors, sized for the whole park and crossing roads at planned points only.

A4Fibre

Diverse routes and meet-me rooms

At least two physically separate fibre entries to the park, a campus ring between buildings and carrier-neutral meet-me rooms in more than one building.

A5Security

Layered perimeter

A park boundary, vehicle screening at the gate, a building line and a hall line, each with its own access control and its own record.

A6Movement

Roads and logistics

Road widths, turning circles and pavement design for transformer deliveries and 3.5-tonne racks, with separate routes for staff, visitors and freight.

A7Common

Shared facilities

Operations and security centre, warehouse and staging, loading, fuel storage, water treatment and the amenities for people who work on site.

A8Ground

Levels and drainage

Finished levels above the highest flood level, storm water routed to retention, and landscape that keeps heat and dust away from the plant.

A9Growth

Expansion land

Land and corridor capacity held for buildings not yet planned, and a written rule for how each one connects to the shared systems.

CS-201.2Common blocksSection B

Designed once, repeated across the park.

On a park, the elements that are common to every building are identified first and designed once as a standard set: plant rooms, risers, CDU rooms, electrical rooms, prefabricated services skids and the connections to the corridors. Each building then places those standard blocks by tag and location rather than redrawing them, which shortens design, simplifies procurement and allows the fabricator to produce identical skids in quantity.

On a six-building park, all six drawing sets go to the fabricator together with a schedule of identical skids, so that manufacture is planned for the whole park rather than one building at a time.

CS-201.3Commercial modelsSection C

One park, several ways to lease.

A park can serve several kinds of tenant at once. The master plan and the feasibility model are prepared together so that each plot is matched to the commercial model it will carry, and the shared infrastructure is charged fairly between them.

ModelWhat the tenant receivesWhat the park provides
Powered landA serviced plot with power, fibre and water at the boundaryIntake, corridors, security and common facilities
Powered shellA completed building envelope with power to the buildingAs above, plus the shell, core and main plant spaces
Build-to-suitA complete building to the tenant’s own reference designDesign, procurement, construction and fit-out to that design
Wholesale hallsWhole data halls in a multi-tenant buildingBuilding, plant and operations, with the hall fitted to the tenant
ColocationRacks, cages and suitesEverything up to the rack, operated by the park
Approvals

Many states offer specific incentives for data centre parks, covering land, power tariff, stamp duty and open access. We prepare the park-level approvals once, so that individual buildings and tenants do not each repeat them. See Approvals.

Start a project

Plan the park once.

Send the land area, the power available and the tenants you have in view. We will propose a master plan scope and a phasing approach.

ReplyWithin one working day, from an engineer
OfficesMumbai · Bangalore · Ahmedabad · Toronto
PracticeHyperNext Consulting Service, a proud member of HyperNext Group