The fastest site is the one where the services arrive finished. Design for manufacture and assembly moves pipework, pumps, cooling, cable containment and power distribution out of the building and into the factory, where they are built to tolerance, tested under controlled conditions and shipped while the structure is still rising. It only works if the design is complete and coordinated first. That is where we begin.
Mechanical, electrical and power, made off site.
We prefabricate wherever a system repeats, wherever site labour is scarce or unsafe, and wherever factory testing will catch what site testing would find too late.
Pump and plant skids
Chilled water, condenser water, fire pump and booster sets on common frames, piped, valved and wired.
Liquid cooling skids
Coolant distribution and secondary loops for direct-to-chip cooling, with drip trays and leak detection under every liquid pipe.
Pipe-rack and corridor modules
Pipes, cable trays, busduct and lighting combined in one frame, lifted into corridors and plant spaces in a single piece.
Electrical skids
Low-voltage boards, distribution and rack power panels assembled with containment and tested as one unit.
Power modules and e-houses
Medium-voltage switchgear, transformers and protection in factory-built enclosures, ready to connect.
Plant rooms and risers
Water treatment, plumbing and drainage assemblies, and riser modules stacked floor on floor.
The rules that make prefabrication pay.
Prefabrication saves time only when the design is written for the factory. These rules apply to every skid and module we design.
- Common blocks firstBlocks shared by every building on a campus are designed once, as a standard set, before any building-specific work.
- Types and quantitiesSkids with identical parameters are grouped into types, with the quantity and the skid numbers of each, so the factory can build in series.
- Sized for the routeEvery module is dimensioned to pass through the building’s openings and be set in place with scissor lifts.
- Leaks containedDrip trays with leak detection under all liquid pipework, on every skid and in every design.
- Traceable partsOne barcode per skid, and a readable part code on every item giving material, location, skid number and design number.
- Final at first issueCoordination, codes and factory requirements resolved before manufacturing drawings are issued, so nothing is revised in fabrication.
- Connections auditedEvery pipe, cable and signal checked end to end, from source to load, across skid boundaries.
- Drawings for the makerFully dimensioned CAD manufacturing drawings, with schedules and bills of quantities kept in separate registers.
Seven stages, model to hook-up.
The sequence runs in parallel with civil works, so the services are ready when the building is.
Coordinated design
Architecture first, then every service coordinated in one model, with cross-sections through the whole building.
OutputCoordinated modelModule split
The services divided into skids and modules along the lines that suit the factory, transport and the route into the building.
OutputModule planType schedule
Identical skids grouped into types, quantities fixed, highest-quantity types released first.
OutputType and quantity scheduleManufacturing drawings
Dimensioned drawings, part codes and bills of quantities for each type, issued floor by floor.
OutputManufacturing setFactory build
Fabrication monitored against the drawings, with inspection at agreed hold points.
OutputInspection recordsFactory acceptance
Pressure, flushing, electrical and functional tests witnessed in the factory before dispatch.
OutputFAT certificatesDelivery and hook-up
Delivered in installation order, set by tag and location ID, connected, and tested again on site.
OutputSite acceptance recordWhat the owner gains.
The benefits of prefabrication are measured on the programme, on site safety and in the condition of the services at handover.
| Outcome | How prefabrication delivers it |
|---|---|
| Shorter programme | Services built in the factory while the structure is built on site |
| Consistent quality | Welding, assembly and testing under factory conditions, to one standard |
| Safer sites | Less work at height and fewer trades working in the same space |
| Less waste | Materials cut to schedule in the factory, with offcuts recovered |
| Repeatability | The same skid types reused across buildings and campuses |
Planning a prefabricated build?
Send the building type, the services in scope and the programme. We will set out what can be made off site and how much time it saves.