Rack-scale AI changes the power, the cooling and the structure of a data centre at the same time, and the decisions that accommodate it are expensive to reverse. We help owners and operators choose the platform and specify the building around it, drawing on direct experience of 800 VDC distribution, direct-to-chip liquid cooling and the structural demands of rack-scale systems.

800 VDC from the intake to the rack, without a UPS.
Power arrives at 33 kV and is converted once, through a medium-voltage solid-state transformer developed with GE Vernova, to 800 VDC that runs directly to rack power panels. The conventional transformer, the UPS room and the central battery room are removed from the building, together with the losses and the cooling they would have needed.
Because the distribution chain is sized for the hall rather than for the first tenant, a rack signed at 10 kW can grow to 600 kW without a new panel, breaker or cable and without downtime. The only limit is the power envelope of the hall.
- Single conversionFrom 33 kV to 800 VDC, with the solid-state transformer cooled on the facility glycol loop.
- Ride-through at the rackBattery modules on the 800 VDC bus, so there is no transfer and no central battery plant.
- AC servers includedConventional servers run on in-rack DC-AC shelves; DC servers simply change the shelf module.

Liquid to the chip, with no water drawn for cooling.
Heat is taken from the processor by direct-to-chip cold plates and carried away on a sealed propylene-glycol loop, then rejected to atmosphere through dry coolers. There are no cooling towers, no evaporation and no water chillers, and the annual efficiency of the plant is modelled from fifty years of weather for the actual site.
Every hall is given a dedicated CDU room in the grey space, sized for 2.3 MW coolant distribution units, so that moving from air-cooled enterprise racks to liquid-cooled AI racks becomes a fit-out rather than a rebuild.

A building ready before the rack is ordered.
A rack-scale system can arrive weighing up to 3.5 tonnes. We design data hall floors for 2,800 kg/m², size goods lifts, ramps and doors for the delivered rack on its pallet, and check every route from the loading dock to the hall position, so that the building is ready before the order is placed.
The same checks apply whether the platform is NVIDIA, AMD or a hyperscaler’s own design, and they are written into the specification before the building is priced.
Beyond the data hall.
Technology assistance extends to the platforms that run inside the building and the studies that prove the design before it is built.
Sovereign cloud platforms
A sovereign cloud stack in which data, keys, operators and audit remain in India, with code and control built, tested and certified in India. It keeps compliance with the Digital Personal Data Protection Act straightforward for regulated clients.
Campus fibre and on-site scrubbing
Campus fibre rings, carrier-neutral meet-me rooms, and denial-of-service traffic cleaned on the campus within the campus security and network operations centres, rather than routed out through carriers.
PowerStudio
Load flow, short circuit, arc flash, protection coordination, 800 VDC and battery studies from the single-line diagram, developed in-house because no existing tool modelled 800 VDC alongside AC in one building.
CFD Studio
Hot-island and cooling-plant analysis from a DXF or PDF floor plan, run against fifty years of site weather, with coolant consumption and a complete analytical report.
Watch the filmAirflow and heat, proven before the hall is built.
CFD Studio takes a floor plan as DXF or PDF and runs a computational fluid dynamics analysis of the hall: where hot islands form, how each cooling option performs, and how the plant behaves against fifty years of weather for the actual site, including coolant consumption. It was developed in-house and runs on our own machines, so client drawings never leave our network. The film shows the analysis from plan to report.
Thinking from the practice.
Short perspectives from our engineers on the decisions that shape a data centre.

Why 800 VDC takes the UPS room out of the building
Single conversion from 33 kV to the rack removes rooms, losses and a fire risk, and lets density change without new panels.

Renewable power should be measured by the hour
Annual renewable claims hide the night. Hourly matching shows what a data centre actually runs on.

Planning a site for 3.5-tonne racks
Rack-scale AI changes the ground study, the structure and every route from the loading dock to the hall.
Bring the workload. We will specify the building.
Tell us the platform and the density you expect. We will set out what the power, cooling and structure need to provide.