Overview

A renewable claim is only as good as the hours it covers. Our method begins by reducing what the building needs, then supplies that demand from captive solar and wind on the best available land, moves daytime energy into the night with storage, carries it to the site under open access, and reports the match between renewable supply and actual consumption for every hour of the year.

In figures
Method7stepsFrom reducing demand to hourly matching
Matching8,760hRenewable supply matched hour by hour
Design ceiling1.30PUEDemand reduced before supply is bought
Cooling water0Sealed loops and dry coolers on every design
CS-601.1The methodSection A

Seven steps, in the order we take them.

The method is applied in the same order on every appointment. It starts inside the building, because every unit of demand removed by design is a unit that never has to be generated, stored, wheeled or certified, and it ends with a monthly report that a tenant can place in its own sustainability disclosures.

GP-01

Reduce the demand

Single conversion from 33 kV to 800 VDC at the rack, no UPS losses, direct-to-chip cooling on sealed glycol loops, dry coolers and a PUE ceiling of 1.30. The building is designed to need less before any supply is contracted.

OutputDesign energy basis
GP-02

Measure the hours

An hourly demand profile for every phase, drawn from the rack mix and fifty years of site weather, so that supply is matched to the shape of demand rather than to an annual total.

Output8,760-hour demand profile
GP-03

Generate where the resource is

Captive or group captive solar and wind on land with the strongest resource, which is seldom the data centre site. We identify the land, structure the ownership and contract the plant.

OutputGeneration plan and plant contracts
GP-04

Store for the night

Battery storage sized to carry surplus daytime solar into the evening and night hours, assembled in India from imported cells, with dispatch rules set by the hourly model.

OutputStorage sizing and dispatch rules
GP-05

Wheel and bank

Renewable energy carried to the site under green open access, using the wheeling and banking terms the state allows to smooth seasonal differences between generation and demand.

OutputOpen access approvals and schedules
GP-06

Balance the remainder

Hours that captive supply and storage cannot cover are met through green products on the power exchanges or long-term agreements with third-party renewable generators, with utility supply held as firm back-up.

OutputBalancing strategy
GP-07

Match and report

Metered renewable supply compared with metered consumption for every hour, reported monthly to the client and, where they wish, to each tenant by name.

OutputMonthly hourly-matching report
CS-601.2StorageSection B

Storage at two scales, for two different purposes.

At the scale of the grid connection, battery storage moves renewable energy from the hours in which it is generated to the hours in which it is needed, and lowers the share of demand that must be bought from the utility or the exchanges. We size it from the hourly model and specify it for assembly in India.

At the scale of the rack, battery modules on the 800 VDC bus provide ride-through for the IT load without a central UPS or a battery room. The two are sized separately and never confused: one is an energy decision, the other a reliability decision.

CS-601.3Water and landSection C

Green means more than the meter.

A data centre that buys renewable electricity but evaporates millions of litres of water for cooling has moved its environmental cost rather than removed it. Our designs use sealed propylene-glycol loops rejected through dry coolers, with no cooling towers, no evaporation and no water chillers, so the only water a campus uses is for the people who work there and for fire protection, and that water is treated and reused on site.

The same discipline applies at the end of a building’s life. We write zero landfill into the specifications we prepare, so that retired equipment goes to material recovery rather than disposal.

C1

Zero cooling water

Closed glycol loops and dry coolers on every design, sized from fifty years of site weather.

C2

Zero discharge

Domestic water treated and reused on site for landscape and flushing.

C3

Zero landfill

Equipment lifecycle and electronic waste handled through material recovery, not disposal.

General note

The renewable share is set by the client and written into the design basis at the feasibility stage, so that land, storage and contracts are sized for it from the start rather than added later.

Start a project

Make the claim hourly.

Tell us the load, the state and the renewable share you need to report. We will set out how it can be supplied and evidenced.

ReplyWithin one working day, from an engineer