Hyperscale tenants ask for the same things in every market: power that is certain and available at scale, capacity delivered on the date promised, headroom for densities they have not yet deployed, no water drawn for cooling, renewable supply they can report with confidence, and a building that follows their own reference design rather than a landlord’s preferences. These are the requirements we design around from the first sketch, not features added at the end.
Eight things a hyperscale tenant expects, and how we provide them.
Each requirement below is met by a specific design or commercial decision, and each can be traced in the design. A tenant reviewing a site with us can see the decision on the drawings, in the contracts and in the building itself.
| Ref | Requirement | How it is met |
|---|---|---|
| HS-01 | Certain power at scale | Allocation and connection secured for the final campus at the feasibility stage, with substation capacity held above the planned IT load |
| HS-02 | Density headroom | 800 VDC distribution sized to the hall, so a rack can grow from 5 kW to 600 kW without new panels, breakers, cables or downtime |
| HS-03 | Liquid readiness | A dedicated CDU room in every hall, sized for 2.3 MW units, and floors designed for 3.5-tonne racks at 2,800 kg/m² |
| HS-04 | No water for cooling | Sealed propylene-glycol loops and dry coolers, with no cooling towers, no evaporation and no water chillers |
| HS-05 | Efficiency | A PUE ceiling of 1.30 on every design, verified against fifty years of site weather rather than a single design day |
| HS-06 | Renewable supply | Captive solar and wind, storage and green open access, with renewable supply matched to consumption hour by hour and reported monthly |
| HS-07 | Their design, not ours | Build-to-suit halls and buildings drawn to the tenant’s own reference design by a team trained on hyperscaler reference designs |
| HS-08 | Capacity on the date | Prefabricated services, priority allocation on critical equipment, three-year fixed prices and drawings that are final at first issue |

Security and operations designed in from the first sheet.
Hyperscale tenants audit physical security as closely as they audit power. We plan campuses with layered perimeters, from the park boundary and vehicle screening at the gate to the building and hall lines, each with its own access control and record. We specify gate pass and badge procedures, phone-free data halls and on-campus security and network operations centres as part of the design.
Our operations teams can run a tenant’s facility after handover, or work alongside the tenant’s own staff to the tenant’s procedures.
Land, shell or a finished hall.
Hyperscale requirements are met in several commercial forms, often on the same data centre park. The choice is made with the tenant and modelled in the feasibility study before design begins.
Powered land
A serviced plot on a park, with power, fibre and water delivered to the boundary.
Powered shell
A completed envelope with power to the building, fitted out by the tenant.
Build-to-suit
A complete building to the tenant’s reference design, delivered turnkey.
Wholesale halls
Whole halls in a multi-tenant building, fitted to the tenant’s layout.
Send the requirement. We will show you the site.
Tell us the capacity, density, region and date you need. We will respond with sites, power and a delivery programme.