Demanding buildings differ more than they appear to from the outside. A hyperscale campus is governed by power and speed, an AI hall by density and weight, a bank’s facility by resilience and audit, a disaster recovery site by distance and diversity, a global capability centre by talent and speed to occupation. The practice is organised to recognise those differences at the brief and to carry them through every drawing, tender and test that follows.
Ten types of project, each with its own priorities.
The schedule below sets out the project types we take on, what decides success in each, and the role we usually play. Most appointments combine several of our services; the right combination depends on what the client already holds and how much of the work it wishes to keep in-house.
| Type | Typical scale | What decides success | Usual scope |
|---|---|---|---|
| EX-01 Hyperscale campus | Multi-building, 100 MW and above | Power certainty, speed to capacity, tenant reference design | Ground study to turnkey delivery |
| EX-02 Data centre park | Several buildings behind one intake | Master plan, shared infrastructure, phasing without disruption | Master plan, approvals, design standard |
| EX-03 AI and rack-scale halls | Racks from 100 kW to 600 kW | Liquid cooling, 800 VDC distribution, floor loading, logistics | Technology assistance, design, fit-out |
| EX-04 Enterprise and banking | Single building, Tier IV practice | Resilience, audit, regulatory expectation | Design and procure, commissioning |
| EX-05 Disaster recovery | Paired sites, active-active | Separation, network diversity, recovery objectives | Site selection, feasibility, design |
| EX-06 Government and sovereign | State and national facilities | Data residency, security, procurement compliance | Feasibility, procurement, owner’s engineer |
| EX-07 Colocation and wholesale | Multi-tenant buildings | Flexibility between tenants, leasing models, operating cost | Feasibility, design, BMS |
| EX-08 Retrofit and density upgrade | Existing facilities in operation | Working around live load, adding liquid cooling, raising density | Survey, design, infrastructure fit-out |
| EX-09 Offices and GCCs | Single floors to multi-building campuses | Talent, speed to occupation, parent-company standards, green certification | Workplace strategy, design, turnkey fit-out, LEED or IGBC |
| EX-10 Solar and storage | Rooftop systems to captive plants with storage | Bankable yield, connection, safe and correctly sized storage | Solar EPC, battery storage, open access |
From one hall to a whole park.
The same standard applies at every scale. What changes is where the decisive work sits: in a single hall it is the fit-out and the density; across a park it is the master plan and the shared infrastructure that every later building will depend on.
A single data hall
Fit-out, density upgrade or liquid cooling added to an existing building.
A complete building
Architecture, MEPF, approvals, procurement and construction for one facility.
A multi-building campus
Several buildings phased behind one intake, designed to one standard.
A data centre park
Plots for several tenants, shared corridors and park-level approvals.
On site, in design and under construction.
A selection of the buildings and sites our people are working on, from campus master plans to structures rising on site.

Two-building campus
DesignCampus layout with shared intake, landscaped grounds and phased buildings.

Facade study
DesignBuilding envelope and facade developed with the services strategy.

Site groundbreaking
Start on siteGround study complete, approvals in place, construction begins.

220 kV substation
EnergisedHigh-voltage intake energised ahead of the first data hall.
Where we work.
The practice works throughout India from offices in Mumbai, Bangalore and Ahmedabad, and in Southeast Asia and Africa, with engineering support from Toronto. Outside India we design to local codes with our own standard applied on top, and we work alongside local partners for approvals and construction.
India
Every state framework for power, open access, approvals and data centre incentives.
Southeast Asia
Local codes and utilities, with the practice standard applied throughout.
Africa
Gateway facilities for banking and sovereign workloads, with local partners.
Tell us about your project.
Send the type, the scale and the region. We will tell you how we would approach it and who would lead it.