The feasibility study decides whether a data centre should be built, how large, in how many phases and with which architecture. We build it as an open Excel model in which every assumption is visible on its own sheet and every result can be traced back to its source, so that a board, a lender or a joint venture partner can test it for themselves rather than relying on a summary.

In figures
Model sheets9From site inputs to the board summary
Architectures3AC hyperscale, 800 VDC, or mixed halls
Weather record50yrsBehind the annual efficiency profile
Hidden cells0Every formula and assumption is open
CS-102.1Structure of the modelSection A

Nine sheets, read from inputs to returns.

The model is arranged so that it reads in one direction. Physical facts from the ground study and the power study enter at the top; design choices and costs are built up in the middle; revenue, financing and returns are calculated at the end. Nothing is typed into a results sheet by hand, and every input carries a note recording where the figure came from and when it was last confirmed.

Because the model is built by the same team that prices and procures live data centre projects, the capital costs come from current tenders and contracts rather than published averages, and the operating costs come from facilities in operation rather than rules of thumb.

SheetContentsMain sources
FM-01 InputsSite, land, power availability and tariff, climate, programme dates, state incentivesGround study, power study, policy review
FM-02 ProgrammeBuildings, halls and IT megawatts by phase, with the rack density mix in each hallMaster plan, tenant brief
FM-03 ArchitectureAC hyperscale, 800 VDC or mixed halls; N+N or active-active reliability; the grey space each option needsConcept design
FM-04 CapexLand, civil and structure, electrical, mechanical, fire, low voltage, fit-out and fees, phased by quarterCurrent tenders and contracts
FM-05 EnergyAnnual PUE profile from site weather, energy use by phase, tariff and supply mix including renewablesCFD Studio, power procurement model
FM-06 OpexPower, maintenance, staffing, insurance, security, lease and statutory costsOperating records from facilities in service
FM-07 RevenueColocation per kW, wholesale per MW, build-to-suit and powered-shell terms, with the absorption rampMarket evidence, tenant discussions
FM-08 FinanceDebt and equity structure, drawdown, interest, tenor, tax and depreciationClient and lender terms
FM-09 SummaryProject and equity returns, payback, peak funding, debt service cover and the sensitivity chartsCalculated, never typed
CS-102.2ScenariosSection B

The decisions the model is built to compare.

A feasibility study earns its fee when it changes a decision. The model is therefore set up around the choices a client actually faces, each held as a switch on the architecture sheet so that the whole model recalculates when it is changed.

B1Architecture

AC, 800 VDC or mixed

An 800 VDC hall without UPS removes the UPS and battery rooms that take up to 55 per cent of conventional grey space, and lowers conversion losses. The model shows what that is worth on your site.

B2Reliability

N+N or active-active

A single site built N+N, or two sites running active-active for disaster recovery. The capital cost, the operating cost and the service each tenant can be offered are compared side by side.

B3Phasing

How much to build first

The size and timing of each phase against the absorption ramp, showing the trade between early capital and the cost of building twice.

B4Density

The rack mix

Enterprise racks, GPU clusters and rack-scale AI systems in different proportions, with their effect on power, cooling, floor loading and revenue.

B5Power

Supply mix and tariff

Grid supply, open access, captive renewables and storage in different proportions, taken from the power procurement model.

B6Commercial

Who the building is for

Retail colocation, wholesale halls, a single build-to-suit tenant or a powered shell, each with its own revenue pattern and risk.

CS-102.3Sensitivity and riskSection C

Showing where the case is strong and where it is fragile.

Every model carries a sensitivity sheet that moves the inputs most likely to be wrong and shows the effect on returns. The results are presented as a ranked chart, so that the few assumptions which matter most are obvious and can be verified before money is committed. Where an assumption cannot yet be confirmed, the report says so plainly and states what would confirm it.

  1. Power tariff and supply mixThe largest single operating cost over the life of the building.
  2. Absorption delayThe effect of tenants arriving six or twelve months later than planned.
  3. Capital cost variationOverrun on the major packages, separately for civil, electrical and mechanical work.
  4. Annual PUEEfficiency across real seasons rather than a single design-day figure.
  5. Interest and tenorThe cost and length of debt during construction and operation.
  6. Connection dateThe effect of the grid connection arriving later than the building.
General note

The model is handed over unlocked. Clients and their advisers may change any input, add sheets or rebuild the summary to their own format. We do not publish cost-per-megawatt figures; capital costs in each model are built up for that site from current market prices.

CS-102.4DeliverablesIssue schedule

What the study hands over.

The feasibility study closes with the model, a written report that explains it, and a short summary written for a board or investment committee. We present the findings in person and remain available to answer questions from lenders and partners during their own review.

  1. Feasibility modelUnlocked Excel workbook with all nine sheets and a scenario manager.
  2. Feasibility reportThe basis of every assumption, the scenarios compared and the recommendation.
  3. Board summaryA short paper for decision, with the sensitivity chart and the key risks.
  4. Concept drawingsBlock plan and phasing drawings that match the model, in DXF and PDF.
  5. Energy profileAnnual efficiency and energy use by month, from site weather.
  6. Risk registerEach open risk with its owner and the action that would close it.
Start a project

Test the case before you build.

Send the site, the intended capacity and the commercial model you have in mind. We will set out the scope of the study and the inputs it needs.