HyperNext Consulting Service · A proud member of HyperNext Group
Aerial render of a two-building data centre campus in landscaped grounds
HyperNext Consulting Service

From ground study to infra fit-out.

We plan, design and deliver data centres, offices for companies and GCCs, certified green buildings, campus master plans, substations, and solar and storage plants.

Explore our services
01 / 03
Who we are

Mission-critical and commercial buildings, done properly.

HyperNext Consulting Service brings architects, electrical, mechanical, fire and plumbing engineers, power system and CFD analysts, sustainability specialists, procurement teams and site leads together on data centres, offices for companies and global capability centres, green buildings, and solar and battery storage plants. We take a project from the first borehole on an empty plot to the last fibre patched in a fitted floor, with one team, one standard and one supply chain carrying it through every stage.

About the practice

Services

Twenty services, in the order a project needs them.

Commission one service or the whole sequence. Each closes with a documented handover, so the next stage can begin without rework, whether it is carried out by us, by your own team or by another firm.

A multi-storey data centre building under construction
Projects

On site, in design and under construction.

Campus master plans, facade studies, high-voltage intakes energised ahead of the first hall, and buildings rising on site. Eight project types, four scales and six ways to engage the practice.

Projects and experience

The practice in figures
Practice team80Architects, engineers and analysts
Services20From ground study to infra fit-out
Rack density600kWDesigned for, alongside 5 kW racks
Design ceiling1.30PUEOn every design, with no water for cooling
CFD Studio

Airflow and heat, proven before the hall is built.

Our own computational fluid dynamics software takes a floor plan as DXF or PDF, finds hot islands and tests the cooling plant against fifty years of weather for the actual site. It runs on our own machines, so client drawings stay on our network.

Technology assistance

CFD Studio · analysis from plan to reportFull screen
The practice open-plan engineering office
Careers

Design the buildings the next decade will run on.

We are looking for architects, MEP engineers, power system and CFD analysts, buyers and site leads who want to work on demanding buildings and do them properly.

Careers at the practice

Offices

Four offices, one standard.

Projects are staffed from whichever office has the discipline and the proximity the site needs, with engineering support from Toronto.

India

Mumbai

WeWork BKC, Bandra Kurla Complex, Mumbai 400051

India

Bangalore

Bagmane Tech Park, Mahadevapura, Bengaluru 560048

India

Ahmedabad

Navratna Corporate Park, Tower A, Ambli Bopal Road, Ahmedabad 380058

Canada

Toronto

181 Bay Street, Toronto, ON M5J 2T3

Start a project

Bring the site. We will bring the rest.

Send the location, the load you have in mind and the stage the project has reached. An engineer from the relevant discipline will reply within one working day.

ReplyWithin one working day, from an engineer
OfficesMumbai · Bangalore · Ahmedabad · Toronto
PracticeHyperNext Consulting Service, a proud member of HyperNext Group