Overview

Building services are prefabricated into skids in a factory while the structure rises, delivered numbered and lifted into place. The site team then manages construction, safety and the infrastructure fit-out of each hall, through containment, power, cooling and fibre to the rack position, and tests and commissions every system before the building is handed over ready for load.

CS-303.1PrefabricationSection A

The factory builds; the site assembles.

The elements common to every building on a campus are identified and designed first as one standard set, so the fabricator can produce identical skids in quantity. Skids with the same parameters are grouped into types, each drawing shows the quantity and the skid numbers it covers, and the type with the highest quantity is manufactured first.

Each skid carries one barcode, and every item on it carries a readable part code recording its material, location, skid and design number, so that anyone on site can trace a fault or have a part remade. Skids are sized to pass through the building’s openings and be raised into position on scissor lifts, and every connection is audited end to end before the drawings are released to the factory.

RefElementMethod
PF-01Glycol cooling pipeworkPrefabricated, with drip trays and leak detection under every run
PF-02Air and smoke ductsPrefabricated
PF-03Cable trays, ladders and busduct runsPrefabricated, with busduct kept inside the building
PF-04Fibre racewayPrefabricated
PF-05Shared multi-service racksPrefabricated, carrying several services in one frame
PF-06Fire protection and plumbingInstalled on site by the specialist trades
PF-07Brazed refrigerant pipeworkInstalled on site
CS-303.2Infrastructure fit-outSection B
Direct-to-chip liquid cooling hoses inside a server rack
Fig. 01  Liquid cooling connected at the rackNTS
White space

From an empty hall to a hall ready for load.

Infrastructure fit-out is the stage at which a finished shell becomes usable capacity. We set out rack positions from the issued drawings, install containment, bring 800 VDC or AC power to each position, extend the secondary cooling loop to the racks that need liquid, run fibre and structured cabling, connect every sensor to the BMS, and test each hall before a tenant moves in.

  1. Set-outRack rows, containment and service zones marked from the coordinated drawings.
  2. Power to positionRack power panels and whips to each rack, with no tap-off boxes.
  3. Liquid to rackSecondary loop and manifolds from the CDU room, pressure tested and flushed.
  4. Fibre and cablingOverhead raceway, patching and labelling to the network design.
  5. MonitoringEvery point connected to the BMS and tested before handover.
CS-303.3SiteSection C

Managed, safe, tested and handed over.

One site team carries the work from mobilisation to handover. A vendor reaches site only in a fixed order: drawings reviewed and approved, the purchase order placed, and only then a gate pass issued.

C1

Construction management

Programme, interfaces between trades, daily progress and quality records, and a single point of responsibility on site.

C2

Safety and access

Gate passes issued after drawing approval and order, badges collected from the main security office, no phones in data halls and no smoking anywhere on campus.

C3

Testing and commissioning

Factory acceptance, site acceptance and integrated systems tests, witnessed and recorded, with every result on file before load is applied.

C4

Handover

As-built drawings in DXF and PDF, operation and maintenance records, the approvals register and an operations team trained on the building.

Start a project

Ready to build?

Send the drawings or the brief. We will return a programme, a prefabrication plan and a fit-out sequence.

ReplyWithin one working day, from an engineer
OfficesMumbai · Bangalore · Ahmedabad · Toronto
PracticeHyperNext Consulting Service, a proud member of HyperNext Group