We complete the architectural set before any services package begins, because electrical, mechanical, fire and plumbing systems cannot be designed responsibly into a building whose walls, levels and columns are still moving. Each services package is then drawn on that fixed base by the same team, coordinated floor by floor, and issued final, so that the set which leaves the office is the set the contractor builds.
Six disciplines, drawn as one set.
Every package is prepared on the same architectural base and coordinated with every other before issue. When a sheet in one package changes, the related sheets in the others change with it: support and mounting details, coordinated sections, containment routes and plumbing, so that no package is ever issued out of step with the rest.
The building
Site plan, a plan of every floor, elevations, sections, cores and circulation, room data and the structural loading brief for 2,800 kg/m² data hall floors.
Power and earthing
High and medium voltage intake, 800 VDC or AC distribution to the rack, emergency generation, lighting and small power, with earthing on its own sheets.
Cooling and air
Glycol loops, dry coolers, CDU rooms, air and smoke management, and comfort cooling for the spaces people occupy.
Detection and suppression
Detection, two gas suppression rooms on opposite sides of each Tier IV hall, and pre-action sprinklers in the halls.
Water and drainage
Domestic supply, drainage, treatment and reuse through the sewage treatment plant, with no water drawn for cooling.
Systems and security
Fibre raceway, structured cabling, access control, CCTV and the field devices of the building management system.
Twelve rules applied to every sheet.
These rules govern every drawing set the practice issues. They follow AECOM and Jacobs drafting practice and Indian standards at the highest class each offers. Their purpose is a set that can be priced accurately and built without a site office full of queries.
| Rule | Requirement |
|---|---|
| DS-01 Sequence | Architecture is completed first. Services are designed on a finished building and never ahead of it. |
| DS-02 Plans | A plan sheet for every floor, each showing the whole floor. No typical-floor sheets and no split plans unless requested. |
| DS-03 Dimensions | Full dimensions on every plan to engineering drawing standards, and detailed levels and dimensions on every section. |
| DS-04 Sections | Coordinated sections through the whole building, floor by floor, showing cable trays, ducts and pipes together. |
| DS-05 Callouts | Numbered callouts in place of text labels, keyed to a schedule in Excel, so that sheets read clean and nothing overlaps. |
| DS-06 Schedules | No tables or schedules on drawing sheets. Text, schedules and specifications are issued in Excel. |
| DS-07 Tagging | Every electrical item and connection is tagged to the bill of quantities: what connects to what, at which level, on which system. |
| DS-08 Earthing | Earthing is drawn on separate sheets and never mixed with power connections. |
| DS-09 Liquid | Drip trays with leak detection under every liquid pipe, including those inside prefabricated skids. |
| DS-10 Layout checks | No column in the middle of a room or at a door, and circulation checked for staff, service personnel and escorted visitors. |
| DS-11 Files | One DXF containing every sheet of a package, with the matching PDF set, in open formats. |
| DS-12 Issue | Final at first issue. Coordination, codes and prefabrication needs are resolved before anything leaves the office. |

Leaks are designed out before they can happen.
Direct-to-chip cooling brings glycol within reach of the most valuable equipment in the building. Every liquid pipe in our designs runs above a drip tray fitted with leak detection, and the condition of the coolant is measured continuously on the loop by an inline fluid quality valve, so that it is changed when its condition requires rather than on a calendar.

A conventional hall or an 800 VDC hall, from the same team.
We design conventional AC halls to hyperscaler reference requirements, and 800 VDC halls without UPS in which a rack can move from 5 kW to 600 kW without new panels, breakers or cables. Mixed halls run AC servers on in-rack DC-AC shelves. The choice is made in the feasibility model, on the client’s numbers, before design begins.
Our architects and MEP engineers are trained on NVIDIA and hyperscaler reference designs, and they carry a single drawing standard across every building they design.
Every hall is tested for heat before it is issued.
Before a mechanical package is issued, the hall layout is analysed in CFD Studio, our own computational fluid dynamics software. Hot islands are found and corrected on the drawing rather than on site, the cooling plant is checked against fifty years of weather for the site, and the results are issued with the design. The film shows the analysis from floor plan to report.
Thinking from the practice.
Short perspectives from our engineers on the decisions that shape a data centre.

Why 800 VDC takes the UPS room out of the building
Single conversion from 33 kV to the rack removes rooms, losses and a fire risk, and lets density change without new panels.

Renewable power should be measured by the hour
Annual renewable claims hide the night. Hourly matching shows what a data centre actually runs on.

Planning a site for 3.5-tonne racks
Rack-scale AI changes the ground study, the structure and every route from the loading dock to the hall.
Send the brief. Receive the set.
Tell us the site, the load and the tenant. We will return the design scope, the programme and the team who will draw it.