R800
Power, redrawn.
800 VDC from the solid-state transformer straight to the rack. No uninterruptible power supply room, no alternating current conversion in between. A solid-state breaker on every output and the battery behind the same door.

Everything, behind one door.
A single enclosure, 800 wide by 1,400 deep by 2,300 high, carrying the incomers, the output stage, the metering and the battery. Whips leave through the roof so the floor stays clear.

R800 · front door open
Inside the enclosure
- Incomers
- Two 630 A. Switch-disconnect rated 1,000 VDC, input solid-state switch and Type 2 DC surge protection on each
- Outputs
- Twelve cassette slots, plug-in and hot-swap. Up to 24 rack outputs on a shuttered backplane
- Battery
- Battery drawers at 100 kW each, fitted by demand
- Risers
- Copper. +400 V, return and −400 V, OCP ORv3 HVDC
- Metering
- Class 0.5 on every output. Modbus TCP, SNMPv3, Redfish
- Enclosure
- 800 W × 1,400 D × 2,300 H mm, plinth included. RAL 9005 fine texture, IP2X
The panel is built in layers: the incomer zone at the top, the output tiers in the middle and the battery bays below. Each zone is serviced on its own, and from the rear there is a 250 A isolator for every battery bay, lockable off, behind a clear guard.
Protection at the speed of silicon.
Direct current gives a breaker no current zero to interrupt at. Every protective device in this panel is a semiconductor, so there is no arc to extinguish and no contact to move.

ISS · input solid-state switch, 630 A
There is no software in the trip path. A desaturation trip acts in under two microseconds per module row, a Hall over-current trip in under five and latches until reset, and the emergency power off is a hard-wired loop. The controllers see what happened afterwards over CAN-FD; they are not asked to decide.
Plug in. Hot-swap.
Each cassette is a drawer carrying its own breakers, isolator and metering. Changing what a rack can draw means changing a cassette, not rebuilding the distribution behind it.

C064 · two 64 A outputs, 800 VDC
Two cassettes
C064
Two outputs
- Per output
- 64 A
- Feeds
- Two racks from one cassette
- Switching
- Silicon carbide on both the +400 V and −400 V poles
- Isolation
- A three-pole galvanic isolator per output
- Whip
- W064Y
C125
One output
- Per output
- 125 A
- Feeds
- PS800-DD-82 and PS800-DA-37 shelves at N+0
- Switching
- The same boards, the two paths in parallel
- Isolation
- One 125 A isolator
- Whip
- W125Y only, the second bore is plugged
Every cassette
- Trip
- Short circuit under 2 µs on every output
- Whip pull
- Output opens in under 100 µs, so there is no spark
- Metering
- Class 0.5 on every output
Insertion runs in three stages, every time. The protective earth finger makes 22 mm before the cassette is home, leading leaves charge the DC link, and only then do the power pins and jaws make, with no current flowing. Pulling a shelf whip opens the output in under 100 microseconds, so there is no spark at the connector.

No uninterruptible power supply room.
The battery sits in the bays below the output stage, on the same 800 volt bus as the load it protects. Nothing transfers and nothing converts twice.
Each bay has a bidirectional solid-state bay breaker between the drawer and the panel bus: sixteen silicon carbide devices rated 1,700 V in two groups of eight, tripping on desaturation in two microseconds or less and opening the bay in a millisecond, before any contact could move. The drawer is pre-charged on insertion and the switch closes only under a difference of less than 20 V.
The numbers.
R800 rack power panel
- System
- 800 VDC, three-wire ±400 V with return. OCP ORv3 HVDC
- Incomers
- Two 630 A. Switch-disconnect 1,000 VDC, input solid-state switch, Type 2 DC surge protection
- Outputs
- Twelve cassette slots. C064 at two × 64 A, or C125 at one × 125 A. Shuttered backplane
- Battery
- Battery bays taking 100 kW drawers, 7 + 1 modules, fitted by demand
- Protection
- Output short-circuit trip under 2 µs. Input switch hardware trip under 5 µs. High-voltage interlock on every whip
- Monitoring
- Class 0.5 metering on every output. Modbus TCP, SNMPv3, Redfish. Touch display on the door
- Size
- 800 W × 1,400 D × 2,300 H mm, plinth included
- Finish
- RAL 9005 fine texture, prong perforation, Lazer Green status line
- Design
- HyperNext Engineering, Toronto. Made in India
The rest of the line
Talk to the engineering team.
Specifications, drawings and deployment planning for the 800 VDC product line. Designed by HyperNext Engineering, Toronto. Made in India.
