India · Chhattisgarh · DRaaS · Apr 2028

Nava Raipur

India's first purpose-built Disaster Recovery as a Service campus. Sited in a quiet, geopolitically neutral location with exceptional grid power quality and availability. Engineered for military-grade resiliency. The first operator in India to offer zero-downtime SLAs as a standard commercial commitment, not a premium add-on.

HN-3 · At a glance

100 MW DRaaS · Planned

CENTRAL INDIA · DISASTER RECOVERY CAMPUS
Service
DRaaS · India First
SLA
Zero downtime
Resiliency
Military-grade
Connectivity
Dedicated NHAI fibre
Shared architecture

One architecture,
every campus.

Nava Raipur is built on the same power and cooling design as every other HyperNext site, so a workload moves between them without re-engineering.

800VDC to the rack

Two conversion stages instead of six. Around 95% of the power drawn reaches the chip.

How it works →

33 kV MVSST

Medium voltage reaches the rack through one solid-state stage. No traditional transformer in the chain.

The design decisions →

Direct-to-chip liquid

A sealed glycol loop with dry coolers. No evaporative make-up water.

The cooling system →

2,800 kg/m² floor

Specified for Vera Rubin and AMD rack-scale systems, the highest floor loading in India.

Why it was decided first →
Enquiries

Sizing a workload for Nava Raipur?

Tell us the rack count, the density and the date you need it live.

Talk to engineering

← All campuses