HyperNext Data Center Limited is a public limited company, incorporated to build hyperscale AI-native data center infrastructure across India and Africa. Headquartered in Hyderabad, registered with the Ministry of Corporate Affairs, India.

// The book

The company, on the record.

The same book we would hand a procurement team, dated throughout and built to be checked. Read it here, page by page.

Preparing the book…
1 / 46
01 46

Arrows or tap a side to turn · swipe on touch · Fullscreen for a larger read

// The journey · 2009 to 2026

From a one-bedroom apartment in Toronto to a 1.2 GW AI factory.

Seventeen years of engineering work. One continuous arc. The lineage is short to write down and long to live through.

The original Scriptics apartment workspace in Toronto, 2009
2009
Toronto, Canada

Scriptics begins.

A one-bedroom apartment in Toronto. The work was small. The ambition was not. The original setup, photographed.

Scriptics India Global Delivery Centre, opened 2014
2014
India · Global Delivery Centre

The India office opens.

The first physical office in India. The team scales. From here, the work goes global.

HyperNext office reception in Hyderabad
2022
A new direction

The HyperNext brand is born.

The hyperscale data center vertical earns its own name. HyperNext begins, with a clear remit: build the Responsible Hyperscaler. The Hyderabad office, photographed.

The bhoomi pujan groundbreaking ceremony for the HN-1 campus in Hyderabad, 14 February 2023
14 February 2023
Hyderabad, Telangana

HN-1 Phase 1 breaks ground.

The first HyperNext facility starts construction. The BFSI anchor campus. 64 MW of Phase 1 capacity, planned commissioning December 2026. The first stone of a much larger plan.

HyperNext leadership interviewed against the Forbes India Select 200 backdrop at the DGEMS 2024 Summit
November 2024
Forbes India · DGEMS Summit
RECOGNISED BY
Select 200 · DGEMS 2024

Forbes India Select 200.

Scriptics Technologies, the parent of HyperNext, is named to the Forbes India Select 200 cohort at the DGEMS 2024 Summit, recognising companies with exceptional global business potential. The recognition reflects seventeen years of disciplined engineering. The work continues at the scale this decade now asks for.

HyperNext leadership at the handover ceremony for the company's first CSR commitment, the Nagmati Programme
29 May 2025
The Nagmati Programme · CSR

The Nagmati Programme begins.

HyperNext makes its first major CSR commitment: a ₹5 crore programme to restore the Nagmati watershed in Kutch, Gujarat. Recharge weirs, percolation wells and channel works, engineered to return more freshwater to the ground than the company consumes. The first project under #aiwithoutthirst.

November 2025
Johannesburg, South Africa

The South Africa agreement is signed.

110 MW international gateway facility. The first HyperNext footprint outside India. Designed to anchor BFSI, sovereign workloads, and the next leg of African digital infrastructure.

HyperNext leadership exchanging the signed Memorandum of Understanding with the Hon'ble Chief Minister at the Government of Andhra Pradesh signing ceremony
16 November 2025
Kakinada, Andhra Pradesh

The Andhra Pradesh Government Order is signed.

The Memorandum of Understanding for the Kakinada campus is formalised at the Government of Andhra Pradesh signing ceremony, "India's Sunrise State". State backing for the flagship 1.2 GW AI Factory, and the foundation on which the campus is built.

February 2026
Kakinada, Andhra Pradesh

Kakinada is finalised as the 1.2 GW AI Factory.

India's flagship hyperscale AI campus. 350 acres in Kakinada Industrial City. NVIDIA Vera Rubin Ultra NVL576 and AMD Helios rack-scale GPU systems. Engineered for the workloads that will define the decade. Coverage in The Times of India and across industry trackers.

The HyperNext HN-1 220 kV substation in Hyderabad, energised April 2026
4 April 2026
Hyderabad, Telangana

The HN-1 220 kV substation is energised.

Power before racks. The dedicated 220 kV substation for the HN-1 anchor campus comes online. Grid-scale transmission capacity secured and commissioned. The hardest infrastructure, delivered first, exactly as planned.

Chhattisgarh Chief Minister Vishnu Deo Sai and officials at the formal approval and document handover for the HyperNext data center, Chhattisgarh Investors Connect in Hyderabad, 2026
2026
Nava Raipur, Chhattisgarh

Chhattisgarh land finalised.

The Nava Raipur campus is approved and the land finalised. At the Chhattisgarh Investors Connect in Hyderabad, HyperNext was handed the project documents and approval, a ₹4,200 crore data center, the single largest investment announced at the meet, with Chief Minister Vishnu Deo Sai presiding over the handover. 100 MW. India's first purpose-built Disaster Recovery as a Service campus, with a zero-downtime SLA on the hot tier.

Later in 2026
Supply chain · Vertical integration

Selective acquisitions in the IT supply chain.

Plans take shape for targeted acquisitions across the data center IT supply chain, across server, networking and component layers. The goal: bring critical hardware capability in-house. Faster cycles. Tighter quality. Lower total cost of build. India-built, by design.

Today
Across India and beyond

The work continues.

Three campuses in India. One international gateway. Five Build-to-Suit sites. 2.7 GW of captive renewable energy by 2028. Net Zero by 2030. The same discipline that started in a one-bedroom apartment, applied at the scale this decade now requires.

The Mission · This is What's Next®

We are the
Responsible Hyperscaler®

A hyperscaler that secures power before it pours concrete, cools without drinking the water table, and builds the hard parts itself. Responsible is not a label we added at the end. It is how the whole thing is engineered, from the power up.

FOCUS / 01

Power-first

We secured 330 MW power allocation in Telangana before pouring a single slab of concrete. We own 700 MW of captive solar at Khavda today, with 2 GW more in planning.

FOCUS / 02

AI-native architecture

India's first 800VDC data center architecture, engineered around the rack-scale systems coming from NVIDIA, AMD and HPE. Built for the workloads of 2028.

FOCUS / 03

Responsibly built

#aiwithoutthirst. Our Nagmati River project has saved 5+ billion litres of freshwater. Our captive renewables programme powers the next gigawatts.

How we build

The hardest things,
first.

Real scale is not how fast a slab is poured. It is power readiness. Transmission. Partnerships. The discipline to plan in decades, not quarters. That is the order we work in.

01

Power before concrete

Before construction began on our flagship Hyderabad campus, we secured a 330 MW allocation from Telangana State Transmission Corporation. Our dedicated substation was designed, approved and energised in 18 months. While the industry waits for transmission, ours is already on the grid.

02

Architecture for 2028, not 2018

We did not retrofit a legacy facility for AI. We engineered around 800VDC power delivery, direct liquid cooling, and rack-scale systems from NVIDIA, AMD and HPE. Built for the workloads of the next decade, not the last one.

03

Sustainability is operational

700 MW of captive solar already generating in Khavda, Kutch. 5 billion litres of freshwater saved through our Nagmati River programme. Measurable, today. We do not publish targets and call them strategy.

04

Partners that define the category

NVIDIA, AMD, HPE, IBM, Hitachi Vantara on compute and platform. Delta, Eaton, Schneider Electric, Kirloskar on power, cooling and standby. Each chosen for one reason. They are the best in the world at what they do.

Company information
CINU63111TS2025PLC204792
Phone
Emailhello@hypernxt.com
Registered officeP.NO.9, Bldg No.9, Sy.No.64, Mind Space, B/H VSNL Bldg, Jubilee Hills, Hyderabad, Telangana 500033
How we engage

From discovery to
go-live.

A simple engagement framework. From the first conversation, through to handover. Clarity at every stage.

PHASE / 01

Discovery

We start with a Customer Requirements Form, capturing workload profile, capacity ramp, geography, compliance and commercial preferences. NDA-protected from day one.

PHASE / 02

Solution Design

Engineering, commercial and operations teams co-build a solution, site selection, capacity phasing, power topology, cooling strategy, network architecture, and SLA framework.

PHASE / 03

Commercial Proposal

A single proposal covering pricing model, payment terms, contract tenure, escalation, exit support, and the master services agreement that will govern the relationship.

PHASE / 04

Build & Commission

Civil possession through to L1-L5 commissioning tests. As-built documentation, BMS schemas, and O&M handbooks delivered at acceptance.

PHASE / 05

Go-Live

Customer acceptance testing, white-space readiness, and phased go-live aligned to your ramp. Day-1 operations under HyperNext's 24×7 NOC/SOC.

PHASE / 06

Steady-State Operations

ITIL-aligned operations, single-pane DCIM, tiered remote hands, preventive maintenance and a service-credits regime backed by clear SLAs.

Engagement Models

How we work
with you.

From retail colocation through to full Build-Own-Operate-Transfer. Pick the commercial model that matches your strategy.

01

Colocation, Retail

Single racks to multi-rack deployments.

02

Colocation, Wholesale

Dedicated halls and private suites.

03

Build-to-Suit (BTS)

Bespoke facilities for named customers.

04

Build & Operate

We build, you brand. We run the operations.

05

BOOT

Build-Own-Operate-Transfer for long-tenure customers.

06

Hyperscale Lease

Multi-MW commitments with phased ramp.

07

Edge Deployment

Latency-sensitive workloads, closer to users.

08

Disaster Recovery

Geo-separated DR with sync / async replication.

Industries served

Engineered for
regulated workloads.

We serve the industries where the auditor is in the room. Where the wrong infrastructure decision is a board-level decision. Where the wrong choice has a name.

🏦

Banking & Finance

Core banking, payments, capital markets, lending and insurance. 10 anchor banking tenants confirmed at our Hyderabad campus.

RBI / SEBI / IRDAI
🏛️

Government & Defence

Central and state government workloads, defence research, citizen data and national digital infrastructure projects.

DPDP / CERT-In / NCIIPC
⚕️

Healthcare & Life Sciences

Hospital systems, electronic health records, diagnostic AI, drug discovery, genomic platforms and clinical research.

HIPAA / NDHM
🏭

Manufacturing & Industry 4.0

Industrial AI, predictive maintenance, computer vision for quality, digital twin of factories, supply-chain optimisation.

ISO 27001 / Industry 4.0
📡

Telecom & Media

O-RAN intelligent controllers, network analytics, content delivery, broadcast infrastructure and streaming platforms.

DoT / TRAI
⚡

Energy & Utilities

Grid optimisation, energy trading, renewable forecasting, OT-IT convergence and smart-metering analytics.

CEA / MNRE
🛰️

Aerospace & Strategic

Satellite data processing, aerospace simulation, dual-use technology workloads and export-controlled R&D.

ISRO / DoT
🎓

Education & Research

HPC for institutional research, sovereign AI for academic LLMs, federated learning across universities.

UGC / MeitY
Investments & subsidiaries

The companies we
build and back.

HyperNext sits inside a small group of technology companies. Some we founded, some we invest in. Each is run to the same standard we hold ourselves to.

Quantloop Technologies
Applied AI · Intelligent loops

Quantloop builds intelligent loops: applied-AI systems that turn raw signals into intelligence that keeps learning. Its products include the PhantomCat market-intelligence indicator and VBox, a vertical experience platform, with the same loop engine now reaching into other industries.

Quantloop Technologies Pvt. Ltd. · Ahmedabad, India
quantloop.tech ›
Scriptics Technologies
Deep-tech software & AI

An end-to-end software and AI solutions provider, from enterprise engineering and automation to data, geospatial intelligence and blockchain. A team of 230 professionals, 15 years in business.

Scriptics Technologies Inc. · Toronto, Canada and India
scriptics.ai ›
Instring
AI-powered sports tech

The AI-powered operating system for sports academies. Coaching, performance analytics, scheduling, role-based access and live streaming in one platform, with 40+ features, an eight-tool AI coaching engine and an 18-tool cricket intelligence suite across tennis, pickleball, badminton and cricket.

An applied-AI product by Quantloop Technologies Pvt. Ltd. · India
instring.co.in ›
Standards & Certifications

Engineered to global
benchmarks.

Every HyperNext facility is designed, built, and operated to align with the most rigorous global standards. Infrastructure. Security. Environment. Business continuity. The list below is the framework. Certification audits are scheduled against each facility's commissioning timeline.

Facility & Reliability

Built to the standards that define the category.

  • Uptime Institute Tier III & Tier IVDesign and constructed-facility certification
  • ANSI/TIA-942Tier III and Tier IV telecommunications infrastructure
  • BICSI 002Data center design and implementation standard
Information Security

Audit-ready security posture, day one.

  • ISO/IEC 27001Information Security Management Systems
  • ISO/IEC 27017Cloud Services Security Controls
  • ISO/IEC 27018Protection of Personally Identifiable Information in Public Cloud
  • SOC 1 Type IIInternal Controls over Financial Reporting
  • SOC 2 Type IISecurity, Availability, Processing Integrity, Confidentiality
Quality, Environment & Safety

Operating excellence as a discipline.

  • ISO 9001Quality Management Systems
  • ISO 14001Environmental Management Systems
  • ISO 45001Occupational Health and Safety Management
  • ISO 50001Energy Management Systems
Continuity & Cyber

Resilient by design.

  • ISO 22301Business Continuity Management Systems
  • NIST Cybersecurity FrameworkIdentify, Protect, Detect, Respond, Recover
  • NIST SP 800-53Security and Privacy Controls
  • CSA STARCloud Security Alliance assurance framework
Industry-Specific

Built for regulated sectors.

  • PCI DSSPayment Card Industry Data Security Standard
  • HIPAAHealthcare data privacy (US healthcare workloads)
  • HITRUST CSFCommon Security Framework for healthcare and regulated industries
  • RBI Data LocalisationReserve Bank of India guidelines for BFSI customers
  • SEBI Cybersecurity FrameworkSecurities and Exchange Board of India compliance
Sustainability & Energy

Aligned to the ESG benchmarks our customers report against.

  • LEED (Leadership in Energy and Environmental Design)Targeting LEED Gold for new builds, LEED Platinum for flagship Kakinada
  • IGBC Green Data Center RatingIndian Green Building Council certification
  • RE100 Aligned100% renewable electricity commitment
  • CDP Climate DisclosureCarbon Disclosure Project reporting framework
Trademarks & intellectual property

What we own,
and what we protect.

The HyperNext brand, the marks we trade under and the engineering behind the platform are the intellectual property of HyperNext Data Center Limited (CIN U63111TS2025PLC204792).

MARKS

Registered trademarks

HyperNext and the HyperNext logo, Responsible Hyperscaler® and This is What's Next® are registered trademarks of HyperNext Data Center Limited. They may not be used without written permission.

PATENTS

29 granted, 14 pending

Patents granted and under approval across our 800VDC power architecture, electrical efficiency, liquid cooling and AI workload orchestration. See the portfolio.

EVIDENCE LAYER

Proprietary attestation

The Evidence Layer, our cryptographic attestation system for the Hyper 7 sovereign cloud, is proprietary to HyperNext. Its commitments are contractually backed and verifiable on demand. Trust Center.

ENQUIRIES

Licensing & permissions

For trademark, patent licensing or brand-use enquiries, write to governance@hypernxt.com.

FAQ

Common questions.

Straight answers to what hyperscalers, enterprises, partners and suppliers ask us most, with links to the detail. For anything not covered here, write to hello@hypernxt.com.

Platform, power & deployment
What is 800VDC, and why does it matter?
800-volt direct-current power is the new standard for AI-native data centers, adopted by NVIDIA, AMD, Google, Microsoft and Meta through the Open Compute Project. It carries the densest racks natively, removes five or more conversion stages, and cuts copper and conversion losses. HyperNext is India's first data center built to it. The architecture is on the Technology page, and the engineering is set out in HN-RP-002.
Where do Vera Rubin and Helios deploy across your campuses?
The Hyderabad campus, fully contracted, is deploying NVIDIA Vera Rubin now, 8 by 2 pods at 240 kW a rack, alongside AMD Helios, the first slice of 800 MW of AI cluster we are deploying across the platform. The densest configuration, Vera Rubin Ultra NVL576, lands at the 1.2 GW Kakinada AI Factory. These racks are cooled by our in-house direct-to-chip system. See the campuses, and talk to us early to lock allocations.
Why offer both NVIDIA and AMD?
Because customers should not be locked to one accelerator. AMD Helios is a genuinely open rack-scale platform, well suited to inference, RAG and a growing share of training. Offering both gives real economic and architectural choice. The full silicon and partner stack is on the Partners page.
How does the IBM partnership work?
We deliver IBM Power and IBM Mainframe directly as managed services for BFSI, Power-as-a-Service and Mainframe-as-a-Service, with no layered intermediaries. It underpins the Hyper 7 sovereign cloud. Lower cost, faster onboarding, accountable SLAs.
What is the Kirloskar genset order?
We placed a 192 MW order with Kirloskar Oil Engines (KOEL), 96 gensets in total. The fleet is configured 2N, full redundancy, to back the 64 MW Hyderabad Phase 1 complex and meet the Uptime Tier IV fault-tolerance requirement. Standby power is secured the way we secure everything, the hard part first. The campus detail is on the Data Centers page.
Sustainability, water & environment
How much water does a HyperNext data center use?
For cooling, effectively none. Our halls run sealed propylene-glycol loops rejected through dry coolers, so there is no evaporative cooling and no make-up water. On-site cooling water is zero, and site WUE stays well below 0.1 L/kWh. We watch the coolant chemistry live with an in-house inline fluid-quality valve. A 64 MW campus draws roughly the direct water of a mid-size hotel, mostly for people. The full numbers are in HN-RP-008, The Water Math.
What are your environmental commitments?
Net zero by 2030, 100% renewable cover by 2029, and 2.7 GW of captive renewable energy by 2028. 700 MW of captive solar at Khavda is operational today, with 2 GW more under planning. We target LEED Platinum at the flagship campus, and LEED Gold and IGBC Green across the portfolio. The methodology, not just the slogan, is on the Sustainability page.
What sustainability is operational today, not just promised?
700 MW of captive solar is generating at Khavda. The Nagmati River programme has saved more than 5 billion litres of freshwater. Cooling consumes no on-site water. #aiwithoutthirst is operational, not aspirational. The live detail sits on the Sustainability page.
Commercial, partnerships & procurement
What commercial models do you support?
Retail and wholesale colocation, build-to-suit, build and operate, build-own-operate-transfer, hyperscale lease, edge deployment and disaster recovery. We match the model to your strategy. The full set is on the Services page.
How do partnerships, JVs and contracts work?
We partner across technology, power, land and capital. Technology is OEM-direct, NVIDIA, AMD, HPE and IBM. Sites and capital are structured case by case, build-to-suit, build-own-operate-transfer, or a joint venture. Contracts run under Indian law, with the Master Services Agreement, SLA, Data Processing Agreement and Acceptable Use Policy forming the framework. Bring us the shape of the deal and we will structure around it.
How do I respond to an RFP or become a supplier?
We run a structured RFP process for power, campus network, security, rack systems and managed operations, each with a pre-bid clarification window. We buy OEM-direct wherever we can, and hold suppliers to the same engineering standard we hold ourselves. If you are an OEM or contractor, send a capability profile to hello@hypernxt.com marked for procurement.
How do you acquire land, including brownfield sites?
Power comes before land, always. We secure substation and grid capacity first, then acquire greenfield or brownfield sites on or near that power. We take on brownfield data center assets where the power and fibre are right and the bones are sound, then cure and rebuild them to our standard. If you hold a site or a stranded asset, tell us the power, the fibre and the title.
Working with us
How do I start a conversation?
Email hello@hypernxt.com with a brief, workload, capacity, geography and timeline. We respond with a Customer Requirements Form to formalise discovery under NDA. Security and vendor-risk teams can start at the Trust Center.
Are you hiring?
Yes, across engineering, operations, commercial and corporate functions. Send a CV to hello@hypernxt.com, and see the Careers page for role families.
Get in touch

Talk to HyperNext.

One inbox, watched every working day. Two continents. Four offices.

Email
hello@hypernxt.com

Every enquiry, commercial or technical, reaches the same inbox and gets a reply within one working day.

Registered office · Headquarters

HyperNext Data Center Limited

P.NO.9, Bldg No.9, Sy.No.64, Mind Space, B/H VSNL Bldg, Jubilee Hills, Hyderabad, Telangana 500033, India

CIN: U63111TS2025PLC204792
Global offices
India · Maharashtra

Mumbai

Bandra Kurla Complex

WeWork BKC
Bandra Kurla Complex
Mumbai 400051

India · Karnataka

Bangalore

Bagmane Tech Park

Bagmane Tech Park
Mahadevapura
Bengaluru 560048

India · Gujarat

Ahmedabad

Navratna Corporate Park

Navratna Corporate Park, Tower A
Ambli Bopal Road
Ahmedabad 380058

Canada · Ontario

Toronto

Bay Street Financial District

181 Bay Street
Toronto, ON M5J 2T3
Canada