Nava Raipur and Kakinada. We secured 330 MW substation capacity ">
India · Telangana · BFSI Anchor

Hyderabad

Our BFSI anchor campus, and fully contracted across both phases. A Tier IV facility serving 10 foundation banking tenants. New capacity is being taken at Nava Raipur and Kakinada. We secured 330 MW substation capacity from TSTC, well above the 250 MW IT load, giving comfortable redundancy headroom. Design PUE band 1.25–1.35, with a 1.30 average. Phase 1 is contracted and building out with Vera Rubin, 8 by 2 pods at 240 kW a rack, part of 800 MW of AI cluster we are deploying across the platform.

HN-1 · At a glance

250 MW IT Capacity · Tier IV

SOUTH INDIA · BFSI ANCHOR CAMPUS
Phase 1
64 MW · Dec 2026
Phase 2
186 MW · Apr 2027
Substation
330 MW · TSTC
Design
Tier IV · PUE 1.30
Indian Banks
6 anchor tenants
International Banks
4 anchor tenants
Shared architecture

One architecture,
every campus.

Hyderabad is built on the same power and cooling design as every other HyperNext site, so a workload moves between them without re-engineering.

800VDC to the rack

Two conversion stages instead of six. Around 95% of the power drawn reaches the chip.

How it works →

33 kV MVSST

Medium voltage reaches the rack through one solid-state stage. No traditional transformer in the chain.

The design decisions →

Direct-to-chip liquid

A sealed glycol loop with dry coolers. No evaporative make-up water.

The cooling system →

2,800 kg/m² floor

Specified for Vera Rubin and AMD rack-scale systems, the highest floor loading in India.

Why it was decided first →
Enquiries

Sizing a workload for Hyderabad?

Tell us the rack count, the density and the date you need it live.

Talk to engineering