Careers · We are hiring

Build the
AI decade
with us.

If you want to build infrastructure that matters, at hyperscale, with real engineering challenges, and with the discipline to do it sustainably, write to us.

hello@hypernxt.com →
Why HyperNext

A platform that does the
hardest things first.

We secured power before pouring concrete. We built renewable generation before signing colo deals. We chose 800VDC before retrofitting was an option. If you're someone who runs toward the difficult problem, you'll fit in here.

CULTURE / 01

Engineering-led

Decisions are made on first principles. We work with the world's best, NVIDIA, AMD, HPE, IBM, Hitachi, Schneider, Eaton, Delta, Kirloskar, because the work demands it.

CULTURE / 02

Hyperscale, hands-on

You won't ship slideware here. From a 1.2 GW AI Factory in Kakinada to 192 MW in Johor Bahru to 110 MW in Johannesburg, these are real campuses, on real timelines, with real customers.

CULTURE / 03

Responsibly built

#aiwithoutthirst is not a marketing line. Our Nagmati programme, our 700 MW captive solar, our 800VDC architecture, every choice is filtered through water, energy and material discipline.

Open Roles · 2026

Where we're hiring.

We are hiring across engineering, operations, commercial and corporate functions. If your discipline isn't listed but you believe you can contribute, write to us anyway.

01

Electrical Engineering

HV / MV / LV design · 800VDC · Substations · UPS / Gensets

02

Mechanical / HVAC

Liquid cooling · Chiller plants · CRAH/CRAC · Containment

03

Network Engineering

DWDM · Fibre · Meet-Me-Room · Carrier interconnect

04

Critical Operations

NOC / SOC · DCIM · Incident response · Change management

05

Construction & PM

Civil structures · MEP · Commissioning L1-L5 · QA/QC

06

Sales & BD

Hyperscale · BFSI · BTS · Wholesale colo · Hyderabad & Mumbai based

07

Solution Architecture

AI workload sizing · Capacity planning · TCO modelling · Customer engineering

08

Corporate Functions

Finance · Legal · HR · Communications · Procurement

The HyperNext office, open-plan desks with shared aisles and planting under exposed services
A shared aisle in the HyperNext office, desks running the length of the floor with no corner offices

Open plan, shared aisles, no corner offices. The people who argue it out are the ones who answer for it.

How to apply

Three steps.
No nonsense.

STEP / 01

Write to us

Send your CV and a short note about the work you want to do to hello@hypernxt.com. Reference the role family above if it matches.

STEP / 02

Technical conversation

If there's a fit, we'll set up a working conversation with the function lead. Depth over theatre, we want to understand how you think, not how you interview.

STEP / 03

Site visit & offer

Visit our Hyderabad office, meet the leadership, walk through what you'd own. If we both agree, we move fast on the offer.

Apply via hello@hypernxt.com →