Johor Bahru
Our first campus in Southeast Asia, and the first HyperNext site designed around AMD Helios from the ground up rather than adapted to it. 100% direct-to-chip liquid cooling, with no air-cooled fallback designed in. 800VDC distribution to the rack on the same architecture as the Indian campuses, so a workload moves between them without re-engineering. 80% of power from renewable sources. Ground was broken in November 2026, with the campus live from January 2028.
192 MW Planned Capacity
One architecture,
every campus.
Johor Bahru is built on the same power and cooling design as every other HyperNext site, so a workload moves between them without re-engineering.
800VDC to the rack
Two conversion stages instead of six. Around 95% of the power drawn reaches the chip.
How it works →33 kV MVSST
Medium voltage reaches the rack through one solid-state stage. No traditional transformer in the chain.
The design decisions →Direct-to-chip liquid
A sealed glycol loop with dry coolers. No evaporative make-up water.
The cooling system →2,800 kg/m² floor
Specified for Vera Rubin and AMD rack-scale systems, the highest floor loading in India.
Why it was decided first →Sizing a workload for Johor Bahru?
Tell us the rack count, the density and the date you need it live.