Johannesburg
Our anchor facility for the African continent, serving the financial-services capital of Sub-Saharan Africa and the broader hyperscale demand emerging across the region.
110 MW Planned Capacity
One architecture,
every campus.
Johannesburg is built on the same power and cooling design as every other HyperNext site, so a workload moves between them without re-engineering.
800VDC to the rack
Two conversion stages instead of six. Around 95% of the power drawn reaches the chip.
How it works →33 kV MVSST
Medium voltage reaches the rack through one solid-state stage. No traditional transformer in the chain.
The design decisions →Direct-to-chip liquid
A sealed glycol loop with dry coolers. No evaporative make-up water.
The cooling system →2,800 kg/m² floor
Specified for Vera Rubin and AMD rack-scale systems, the highest floor loading in India.
Why it was decided first →Sizing a workload for Johannesburg?
Tell us the rack count, the density and the date you need it live.