South Africa · Gauteng · Jun 2028

Johannesburg

Our anchor facility for the African continent, serving the financial-services capital of Sub-Saharan Africa and the broader hyperscale demand emerging across the region.

HN-4 · At a glance

110 MW Planned Capacity

AFRICA · FINANCIAL HUB
Shared architecture

One architecture,
every campus.

Johannesburg is built on the same power and cooling design as every other HyperNext site, so a workload moves between them without re-engineering.

800VDC to the rack

Two conversion stages instead of six. Around 95% of the power drawn reaches the chip.

How it works →

33 kV MVSST

Medium voltage reaches the rack through one solid-state stage. No traditional transformer in the chain.

The design decisions →

Direct-to-chip liquid

A sealed glycol loop with dry coolers. No evaporative make-up water.

The cooling system →

2,800 kg/m² floor

Specified for Vera Rubin and AMD rack-scale systems, the highest floor loading in India.

Why it was decided first →
Enquiries

Sizing a workload for Johannesburg?

Tell us the rack count, the density and the date you need it live.

Talk to engineering

← All campuses