Cloud WAN

Nwan

We never let you fail.

One fabric, one control plane and one bill, from a branch in Kolkata to an AI cluster in Hyderabad to the clouds you run on. Fibre partnerships, optical layer, IP and MPLS fabric, managed edge, control software, consoles and billing: HyperNext runs every layer, so every layer answers to one promise.

Nwan operator console showing the fabric overview, fallback events and post-failure capacity
Under 50 msTo repair a cut path, before a call can notice
9 levelsOf fallback, one supervisor
10 PoPsAcross India at launch
March 2027Nwan 1.0 general availability
The problem

Every day, a fibre is cut.

Somewhere in India, a road is dug and a cable snaps. For most networks that is where the story stops. A payment fails. A call drops. A hospital waits. Networks fail; that is physics. Letting you fail is a choice.

What goes wrong today

Fibre cuts, slow repair
Long-haul routes are cut often and take hours to repair. On most networks, traffic waits for the crew
Hidden shared risk
Two routes sold as diverse often share one duct or one bridge. One cut takes down both
Cloud access in weeks
Private links into cloud regions take weeks to order and run congested at peak
Control that sits abroad
Many controllers and logs live outside India, at odds with the 2026 network data localisation rules
AI traffic on a shared WAN
Datasets and checkpoints moving between AI campuses crowd out everyone else
Bills you cannot check
SLA and billing figures come from measurements the customer never sees
The product

Eight services. One fabric.

Ordered from the tenant console or the API, live in minutes rather than weeks, and billed from the same telemetry you can see.

Nwan tenant console home: connections, edge devices, cloud connects and the monthly estimate

Nwan tenant console

Services

Nwan Port
1G to 400G ports at any PoP or HyperNext campus
Nwan Connect
Point-to-point circuits, 50 Mbps to 100 Gbps, changed in minutes
Nwan Cloud Connect
Private circuits into cloud regions in India, two PoPs by default
Nwan VPN
Any-to-any private network across sites and clouds
Nwan Edge
Managed edge for branch, data centre and cloud
Nwan Wave
100G, 400G and 800G wavelengths between campuses and metros
Nwan Internet
Clean transit, with DDoS cleaned by HyperNext Scrub
Nwan Secure
Firewall, intrusion prevention and segmentation, run by our own SOC
The difference

Nine levels. One supervisor.

Every failure is answered at the fastest layer that can answer it. Only if that layer cannot restore the service does the next one act. One supervisor watches all nine, so nothing waits for a human.

Nwan operator console: the fallback events ladder with each level and its restoration time

Operator console · fallback events

The ladder

F0 · under 50 ms
Light switches to a protection fibre
F1 · under 50 ms
Routers repair the path locally
F2 · under 1 s
The fabric re-optimises every path
F3 · 60 to 180 s
Wavelengths re-route on other fibre
F4 · always on
Alternate carrier carries the load
F5 · under 1 s
Edge moves flows to the best link
F6 · under 1 s
Cloud traffic shifts to a second on-ramp
F7 · no impact
Network runs on if controllers are cut off
F8 · immediate
Committed traffic keeps priority

Every target is proven in acceptance testing on the live fabric before launch.

Proven diversity

Every connection has a twin.

Each committed connection runs on two paths that share no duct, no bridge and no building. We do not assume diversity. We prove it.

Nwan operator console topology view with primary and backup paths traced on separate routes

Path trace · primary and backup on separate routes

Duct levelShared risk recorded from the fibre route survey
In advanceThe second path is ready before anything fails
Always onA second carrier on every core route
Make before breakTraffic returns without dropping a packet
Nwan operator console showing the fabric on the map of India, as officially depicted

The fabric on the map of India

Trust

Run from India. Watched by our own SOC.

Sovereign, secure, transparent

Sovereign
Controllers, telemetry, logs and keys stay in India. Built for the 2026 network data localisation rules. No support access from outside India
Secure
Every link between PoPs encrypted, every edge on IPsec. DDoS cleaned on campus by HyperNext Scrub. Incidents reported to CERT-In within six hours
Transparent
You see the same telemetry we bill on. A 95th percentile you can check yourself. SLA credits applied automatically
Cloud in minutes
Private circuits into the major cloud regions in India, two on-ramps in two PoPs by default plus an encrypted standby path, ordered from the console or API
Branches that stay up
Every link measured ten times a second for loss, delay and jitter. Flows move to the best link in under a second. Zero-touch install
Who it is for
Hyperscalers, banks and financial services, HyperNext colocation tenants, enterprises and GCCs
Nwan tenant console: creating a cloud connection in five steps

Create a connection · live in minutes

Service classes

Monthly availability, by class.

Four classes

Platinum

Dual edge, dual PoP

Availability
99.995%
Access
Two links at once
Core
Protected, separate routes

Gold

Dual PoP

Availability
99.99%
Access
Separate routes
Core
Protected

Silver

Single access

Availability
99.95%
Access
Single
Core
Protected

Standard

Single access

Availability
99.9%
Access
Single
Core
Standard

Timing figures are Nwan 1.0 design targets, each proven in acceptance testing before launch. Services and specifications may change before general availability.

Also offered as a service

Next step

Talk to the engineering team.

Specifications, drawings and deployment planning for the 800 VDC product line. Designed by HyperNext Engineering, Toronto. Made in India.