Rack power panel

R800

Power, redrawn.

800 VDC from the solid-state transformer straight to the rack. No uninterruptible power supply room, no alternating current conversion in between. A solid-state breaker on every output and the battery behind the same door.

HyperNext R800 rack power panel, 800 wide by 2,300 high, with touch display and prong-perforated front door
800 VDCSubstation to rack busbar
Under 2 µsShort-circuit trip, every output
24Protected rack outputs per panel
600 kWBattery behind the same door
The film

See it run.

Inside the panel: solid-state protection on every output, the cassettes, and the battery behind the same door.

R800R800 rack power panel for 800 VDC and AC data centresWatch on YouTube
The panel

Everything, behind one door.

A single enclosure, 800 wide by 1,400 deep by 2,300 high, carrying the incomers, the output stage, the metering and the battery. Whips leave through the roof so the floor stays clear.

R800 panel with the front door open showing incomers, output cassettes and battery drawers

R800 · front door open

Inside the enclosure

Incomers
Two 630 A. Switch-disconnect rated 1,000 VDC, input solid-state switch and Type 2 DC surge protection on each
Outputs
Twelve cassette slots, plug-in and hot-swap. Up to 24 rack outputs on a shuttered backplane
Battery
Battery drawers at 100 kW each, fitted by demand
Risers
Copper. +400 V, return and −400 V, OCP ORv3 HVDC
Metering
Class 0.5 on every output. Modbus TCP, SNMPv3, Redfish
Enclosure
800 W × 1,400 D × 2,300 H mm, plinth included. RAL 9005 fine texture, IP2X

The panel is built in layers: the incomer zone at the top, the output tiers in the middle and the battery bays below. Each zone is serviced on its own, and from the rear there is a 250 A isolator for every battery bay, lockable off, behind a clear guard.

Solid-state protection

Protection at the speed of silicon.

Direct current gives a breaker no current zero to interrupt at. Every protective device in this panel is a semiconductor, so there is no arc to extinguish and no contact to move.

HyperNext ISS input solid-state switch, 630 A at 800 VDC

ISS · input solid-state switch, 630 A

99.93%Efficient at 630 A
0.33 mΩPer pole
24SiC modules, twelve per pole
Under 5 µsHardware trip

There is no software in the trip path. A desaturation trip acts in under two microseconds per module row, a Hall over-current trip in under five and latches until reset, and the emergency power off is a hard-wired loop. The controllers see what happened afterwards over CAN-FD; they are not asked to decide.

Output cassettes

Plug in. Hot-swap.

Each cassette is a drawer carrying its own breakers, isolator and metering. Changing what a rack can draw means changing a cassette, not rebuilding the distribution behind it.

HyperNext C064 output cassette, two 64 A outputs at 800 VDC

C064 · two 64 A outputs, 800 VDC

Two cassettes

C064

Two outputs

Per output
64 A
Feeds
Two racks from one cassette
Switching
Silicon carbide on both the +400 V and −400 V poles
Isolation
A three-pole galvanic isolator per output
Whip
W064Y

C125

One output

Per output
125 A
Feeds
PS800-DD-82 and PS800-DA-37 shelves at N+0
Switching
The same boards, the two paths in parallel
Isolation
One 125 A isolator
Whip
W125Y only, the second bore is plugged

Every cassette

Trip
Short circuit under 2 µs on every output
Whip pull
Output opens in under 100 µs, so there is no spark
Metering
Class 0.5 on every output

Insertion runs in three stages, every time. The protective earth finger makes 22 mm before the cassette is home, leading leaves charge the DC link, and only then do the power pins and jaws make, with no current flowing. Pulling a shelf whip opens the output in under 100 microseconds, so there is no spark at the connector.

HyperNext R800 panel shown exploded: door, top plate and rear panel off, one cassette drawn out
R800, exploded. Door and rear panel off, one cassette drawn.
Battery in the panel

No uninterruptible power supply room.

The battery sits in the bays below the output stage, on the same 800 volt bus as the load it protects. Nothing transfers and nothing converts twice.

Each bay has a bidirectional solid-state bay breaker between the drawer and the panel bus: sixteen silicon carbide devices rated 1,700 V in two groups of eight, tripping on desaturation in two microseconds or less and opening the bay in a millisecond, before any contact could move. The drawer is pre-charged on insertion and the switch closes only under a difference of less than 20 V.

Specification

The numbers.

R800 rack power panel

System
800 VDC, three-wire ±400 V with return. OCP ORv3 HVDC
Incomers
Two 630 A. Switch-disconnect 1,000 VDC, input solid-state switch, Type 2 DC surge protection
Outputs
Twelve cassette slots. C064 at two × 64 A, or C125 at one × 125 A. Shuttered backplane
Battery
Battery bays taking 100 kW drawers, 7 + 1 modules, fitted by demand
Protection
Output short-circuit trip under 2 µs. Input switch hardware trip under 5 µs. High-voltage interlock on every whip
Monitoring
Class 0.5 metering on every output. Modbus TCP, SNMPv3, Redfish. Touch display on the door
Size
800 W × 1,400 D × 2,300 H mm, plinth included
Finish
RAL 9005 fine texture, prong perforation, Lazer Green status line
Design
HyperNext Engineering, Toronto. Made in India

The rest of the line

Next step

Talk to the engineering team.

Specifications, drawings and deployment planning for the 800 VDC product line. Designed by HyperNext Engineering, Toronto. Made in India.