Hyper 7 · Sovereign Cloud

India's real
sovereign cloud.

India's first sovereign cloud, built on the IBM Sovereign Cloud platform, with an Evidence Layer that is cryptographically verifiable. For the first time, sovereignty is not something you declare. It is something you prove. To any auditor. At any time. Without taking anybody's word for it.

Why this exists

Data residency is
not sovereignty.

For a long time, the sovereign cloud conversation asked only one question. Where does the data sit? That is necessary, but it is not enough. The harder questions are who runs the platform, whose hands the keys are in, whose law can reach in, and who can prove all of this. Without trust. With evidence. Hyper 7 was built to answer those questions.

The four pillars

Sovereign by design,
not by promise.

Four things matter, if sovereignty is to mean what it says. Provability. Prevention. Privacy. Portability. We built the platform around them. We did not add them as a layer after the fact.

01

Provability

The Evidence Layer attests. Continuously. Where the workload runs. Who touched it. When configuration changed. Which controls were active at the moment of the audit. Signed. Verifiable. By any third party. We do not ask you to take our word for any of it.

02

Prevention

The keys are held by you. Not by HyperNext. Not by IBM. Not by the host nation. Anchored in FIPS 140-3 Level 4 hardware. Compelled by a foreign jurisdiction or not, the keys remain where they should always have been. With you.

03

Privacy

The control plane is operated by you. Identity, access, secrets, keys, logs, telemetry, all inside the sovereign boundary. No vendor in the middle. No data plane that quietly crosses a border on its way somewhere else.

04

Portability

Open standards throughout. Red Hat OpenShift, Red Hat Enterprise Linux, Red Hat AI, open APIs. Your workload remains portable. Across us. Across hyperscalers. To on-premises. Back to us. On your timeline, not ours.

The Evidence Layer

Proof,
not promises.

The Evidence Layer is the feature that separates Hyper 7 from every cloud that calls itself sovereign by jurisdiction alone. Every operation that touches customer workloads is observed, attested, and recorded with cryptographic integrity. Compliance officers, regulators and customers query the Evidence Layer directly. The platform proves its own sovereignty.

Attestation
Cryptographic proof of residency
Every workload deployment generates a signed attestation of the physical region, the operating personnel's nationality, and the regulatory jurisdiction. Verifiable by any third party.
Access logs
Tamper-evident audit trail
Every access event, configuration change and policy decision is recorded in an append-only, cryptographically chained log. Tampering is mathematically detectable.
Bill of materials
Full software provenance
Every component, model, container image and library carries a verifiable provenance record. Customers see exactly what is running, where it came from, and who signed it.
Continuous monitoring
Real-time compliance state
Compliance posture against RBI, SEBI, DPDP Act, ISO 27001, NIST and customer-specific frameworks evaluated continuously. Drift detected within seconds.
AI provenance
Model and inference traceability
For AI workloads, every training run, model version, inference call and agentic decision is logged with full lineage. Regulator-ready AI auditability built in.
Reporting
Audit packs on demand
Pre-formatted evidence packs for RBI, SEBI BRSR, CERT-In, DPDP Act, GDPR and EU AI Act audits. Generated in minutes, not months.
The IBM Partnership
IBM HyperNext

The systems
that cannot fail.

The world's banks run on IBM, and so do its stock exchanges, its airlines and its payment networks. We deliver Power and Z directly, as managed services, on infrastructure we own and operate ourselves, with no one in the middle.

IBM Power11 enterprise server frame
Power11
IBM Z mainframe with its front doors open, showing the processor drawers inside
IBM Z
IBM FlashSystem 9600 all-flash storage array
FlashSystem 9600
Power as a ServiceAIX · IBM i · Linux
Mainframe as a Servicez/OS
All-flash storagePer-tenant keys
India-residentOperational control
One Control Plane

x86 and Power,
one inventory.

Compute, storage, network, recovery and fabric sit in a single console, with AMD EPYC and IBM Power hosts held in one inventory under one policy model. Not a roadmap. A console you can open today.

Placement
Best-fit, scored live
Choose IBM Power11 or HPE x86, pick the size, the operating system and the resiliency. The Orchestration Layer scores the campus live and places each workload on the best-fit Power frame or x86 cluster. Every customer gets it, at no cost and with no obligation, from the day they sign.
Recovery
18-minute RTO, 5-minute RPO
Orchestrated failover, rehearsed rather than assumed. High availability with fully automated DRS and admission control that reserves what was promised, so a failover has somewhere to land.
Storage
Petabyte-scale, per-tenant keys
Policy-driven vSAN across NVMe, SSD and archive tiers, with encryption keys held per tenant. Snapshot and revert virtual machine state in a click.
Network
400G leaf-spine, firewall per workload
Software-defined per-tenant overlays on a 400G leaf-spine fabric, with a firewall at every workload rather than at the perimeter alone.
Confidential compute
Sealed even from the platform
AMD SEV-SNP memory encryption keeps tenant data sealed from the platform itself. Reconfigure vCPU, memory and virtual disks on a running workload without downtime.
Access
A real guest shell, no agent
Console in the browser with no client, no plugin and no agent to install. Nothing extra to license, and no lock-in.
The film

Sovereign by design.

IBM Sovereign Core on Red Hat OpenShift, run inside HyperNext. Data, keys, operators and audit stay in India.

IBM Sovereign Cloud · Hyper 7

The platform behind
the platform.

Hyper 7 runs on IBM Sovereign Core, the same sovereign-by-design software stack that governments and regulated enterprises around the world have chosen for their highest-trust workloads. We bring it to India with HyperNext infrastructure underneath, Indian sovereign boundary controls around it, and the Evidence Layer on top.

01 / Control plane

Customer-operated

The control plane runs inside the Indian jurisdictional boundary, operated by Indian-cleared personnel under customer authority. No remote operator. No call-home dependency. No external administrative reach.

02 / Identity

In-boundary IAM

Authentication, authorisation, secrets management and certificate authority all in-region. No federated trust to any external identity provider unless the customer explicitly configures it.

03 / Encryption

KYOK with FIPS 140-3 L4

Customer-managed encryption keys held in hardware security modules certified to FIPS 140-3 Level 4, the highest commercially-available rating. Even HyperNext personnel cannot decrypt customer data.

04 / AI workloads

Red Hat AI on-platform

Model training, inference and agentic workflows execute under sovereign authority. Full traceability of model versions, datasets, inference calls and agent decisions captured in the Evidence Layer.

05 / Orchestration

Red Hat OpenShift foundation

Container orchestration on Red Hat OpenShift. Workload portability across cloud, on-premises and hybrid deployments without rewriting applications.

06 / Catalog

Extensible service catalogue

Pre-vetted catalogue of IBM, AMD, Cloudera, Dell, Elastic, Intel, Mistral, MongoDB, Palo Alto Networks and open-source services. Customers add their own approved internal software.

Service Level Agreements

Unmatched SLAs,
backed by credit.

Hyper 7 offers SLA commitments that exceed standard sovereign cloud offerings in India. Every SLA is credit-backed, measured against the Evidence Layer's own attestations, and verifiable by the customer in real time. No marketing numbers. Numbers we will refund against.

Platform-wide commitments
99.999%
Control plane availability, monthly, measured per region
100%
Sovereignty attestation availability, no degradation tolerated
15min
Maximum evidence-generation latency for any control event
Workload commitments
99.99%
Compute and storage availability per managed region
5min
P1 incident acknowledgement, 24x7
Zero
Tolerance for sovereignty-boundary violations, immediate notification
Built for

Where sovereignty
matters most.

There are workloads that cannot live just anywhere. Workloads where it matters who runs the platform. Where it matters whose law applies. Where it matters that the keys are held by you, and only by you. Hyper 7 was made for these workloads.

Banking, Financial Services & Insurance

RBI-compliant cloud, by design.

Core banking, payments, KYC, trading and risk analytics. AI for credit, fraud and onboarding. Every workload audit-ready against RBI, SEBI and IRDAI frameworks.

  • Core banking & payment systems
  • Customer data & KYC platforms
  • Trading, risk & surveillance
  • AI for credit, fraud, onboarding
Government & Public Sector

Sovereign infrastructure for the state.

Citizen data platforms, inter-departmental analytics, national AI initiatives, and critical information infrastructure. Built to DPDP Act 2023 standards by design.

  • Citizen data & identity platforms
  • Inter-departmental data fabric
  • National AI & language models
  • NCIIPC-aligned critical workloads
Healthcare & Life Sciences

Patient data that never leaves India.

Electronic health records, genomic and clinical research, sovereign AI for diagnostics, and pharmaceutical R&D where IP protection is non-negotiable.

  • Electronic health records & HMS
  • Genomic, proteomic & clinical AI
  • Drug discovery & molecular AI
  • Non-invasive diagnostic models
Defence & Strategic Industries

Operational independence, architected.

Defence R&D, aerospace, dual-use technology, energy and telecommunications. Cleared-personnel operations, export-controlled isolation, DoT-licensed environments.

  • Defence R&D & aerospace
  • Export-controlled workloads
  • OT/IT convergence, energy & utilities
  • DoT-licensable telco workloads
Sovereignty · Compared

Where each
cloud actually stops.

"Sovereign" has become a marketing word. The chart below maps the actual sovereignty commitments offered by major cloud providers operating in India, against the same eight dimensions. The differences matter.

Dimension Hyper 7HyperNext, India AWSMumbai & Hyderabad regions Microsoft AzureCentral / South India Google CloudDelhi & Mumbai regions Local DC peersIndian providers
Data residency In-India, cryptographically attested Region-bound, declared Region-bound, declared Region-bound, declared In-India
Operator nationality Indian-cleared personnel only Global SRE pool Global SRE pool Global SRE pool Indian operations
Customer key control (KYOK) FIPS 140-3 L4 HSM CloudHSM, BYOK Azure Key Vault BYOK Cloud HSM BYOK Provider-managed
Foreign-law access risk No foreign reach US CLOUD Act exposure US CLOUD Act exposure US CLOUD Act exposure Indian jurisdiction only
Continuous evidence layer Cryptographic attestations, real-time Annual SOC reports Annual SOC reports Annual SOC reports Annual SOC reports
AI workload sovereignty Model + inference fully traced Bedrock models elsewhere OpenAI dependency Vertex models elsewhere Infrastructure only
Open-standards portability Red Hat OpenShift native Proprietary APIs Proprietary APIs Anthos hybrid Mixed
Indian regulator audit packs RBI / SEBI / DPDP / CERT-In Customer-assembled Customer-assembled Customer-assembled Customer-assembled
Sovereign by design vs retrofitted Sovereign by architecture Sovereignty as policy Sovereignty as policy Sovereignty as policy Sovereignty as locality

Assessment based on publicly-available product documentation and operating-model disclosures as of the current quarter. Hyper 7 commitments are contractually backed and verifiable through the Evidence Layer on demand. Cloud provider statements above are general and may vary by specific contractual arrangement.

Verify the claims
Talk to Hyper 7

Ready to see the proof?

Schedule a workshop with our Hyper 7 architecture team. We will walk through the Evidence Layer live, map your compliance requirements to the platform, and provide an indicative deployment plan and pricing within 10 working days.