Managed Services

Beyond
infrastructure.

Four managed services that turn HyperNext from a data center operator into a full-stack infrastructure partner. Security operations, network operations, disaster recovery, and migration, delivered with the same engineering discipline as the facilities themselves.

The Services Portfolio

Four ways HyperNext
extends into your stack.

Each service stands on its own. Each one is built to combine. Common operating model. Common security posture. Common SLA framework. The same discipline, applied at every layer.

SVC / 01

SOC as a Service

24x7 Security Operations Center, three analyst tiers, integrated SIEM and threat intelligence, compliance-aligned reporting.

SVC / 02

NOC as a Service

24x7 Network Operations Center, multi-vendor monitoring, ITIL v4 aligned incident and change management.

SVC / 03

DRaaS

India's first zero-downtime DRaaS, anchored at Nava Raipur. Hot, warm and cold protection tiers matched to your RTO and RPO.

SVC / 04

Migration as a Service

End-to-end workload migration, 6R framework, discovery through cutover, with rollback safety nets at every wave.

SOC as a Service

24x7 security operations,
built around your business.

A Security Operations Center, run from Hyderabad, continuously. Three analyst tiers. Integrated SIEM. Threat intelligence and incident response, aligned to MITRE ATT&CK and the NIST Cybersecurity Framework.

Coverage
24x7x365 monitoring
Continuous coverage across infrastructure, network, applications, identity and endpoints.
Staffing model
T1 / T2 / T3 analyst tiers
Triage, investigation and incident-response analysts with documented escalation paths.
Platform
Integrated SIEM
Log ingestion, correlation, alerting, hunting. Multi-tenant or single-tenant deployment.
Intelligence
Threat intel feeds
Commercial and open-source threat intelligence with curated IoC management.
Response
Documented runbooks
Pre-approved incident-response playbooks. SOAR-style automation for repeatable actions.
Reporting
Compliance-aligned
Monthly posture reports aligned to ISO 27001, SOC 2, PCI DSS and RBI guidelines.
SLA commitments
15min
Mean Time to Detect, critical incidents
30min
Mean Time to Respond, P1 incidents
99.9%
SOC platform availability
The HyperNext Scrub operations console showing live DDoS mitigation, an adaptive traffic classifier and per-flow verdicts

HyperNext Scrub, mitigating live. Detection to clean return in under sixty seconds, with every packet inspected inside India.

NOC as a Service

Network and infrastructure
operations, on call.

A Network Operations Center, continuously watching network, compute, storage and facility. ITIL v4 by discipline. Integrated with the ITSM platform you already run, not the one we would like you to run.

Scope
Full-stack monitoring
Network, compute, storage, virtualisation, applications, facility BMS and DCIM.
Vendor coverage
Multi-vendor neutral
Cisco, Arista, Juniper, NVIDIA networking. VMware, Red Hat, Microsoft platforms.
Process
ITIL v4 aligned
Incident, problem, change, request and configuration management as standard.
Integration
ITSM-native
ServiceNow, BMC Remedy, Jira Service Management integration out of the box.
Visibility
Real-time dashboards
Customer access to live monitoring, ticket queues and SLA performance.
Proactive
Capacity management
Monthly capacity reporting, performance baselining and trend analysis.
SLA commitments
5min
P1 incident acknowledgement
60min
P1 incident resolution target
99.99%
NOC platform availability
Disaster Recovery as a Service

Zero downtime.
India's first.

Anchored at Nava Raipur. India's first purpose-built DRaaS facility. Military-grade resilience, in a quiet, geopolitically neutral place. Three protection tiers, matched to what your business actually needs to survive. With the option of a zero-downtime SLA on the hot tier.

Tier 1
Hot site
RTOUnder 1 hour
RPONear-zero
SLAZero downtime available

Continuous synchronous replication. Always-on standby compute. Automated failover.

Tier 2
Warm site
RTO4 to 24 hours
RPOUnder 4 hours
SLACredit-based

Scheduled asynchronous replication. Compute provisioned on declaration. Runbook-driven failover.

Tier 3
Cold site
RTO24 to 48 hours
RPO24 hours
SLABest-effort

Daily backup replication. Compute provisioned at recovery time. Manual cutover with HyperNext support.

Site
Nava Raipur
Geopolitically neutral location with exceptional grid quality and military-grade physical resiliency.
Replication source
Cross-region
Hot replication from Hyderabad or Kakinada into Nava Raipur. Independent power, network and facility chains.
DR drills
Quarterly
Managed quarterly DR exercises with documented results and remediation actions.
Compliance
RBI-aligned
DR design aligned to RBI business-continuity guidelines for BFSI customers.
Migration as a Service

From wherever you are,
to HyperNext.

Moving workloads is one of those things that goes well or goes badly. We built ours to go well. Discovery. Assessment. Planning. Execution. Validation. Optimisation. The 6R framework, applied carefully. Rollback safety nets on every wave.

Phase 1
Discovery
Tool-assisted application portfolio discovery. Dependency mapping. Workload classification.
Phase 2
Assessment
6R framework assessment, rehost, replatform, refactor, retire, retain, repurchase, per workload.
Phase 3
Migration design
Wave planning, network and storage cutover design, rollback procedures, change windows.
Phase 4
Execution
Tool-assisted migration using VMware HCX, AWS MGN-equivalent, Zerto and native database replication.
Phase 5
Validation
Application validation. Performance benchmarking against pre-migration baseline. Sign-off and handover.
Phase 6
Optimisation
Post-migration tuning. Cost optimisation. Right-sizing. Documentation handover.
Migration commitments
100%
Documented migration plan with milestones
100%
Rollback capability on every wave
100%
Cutover within agreed maintenance windows
Storage as a Service

Storage tiers,
matched to workload economics.

Block, file, and object. Delivered as a managed service. Sized to your workload, billed on what you use. The same compliance and sovereignty guarantees as the compute it runs alongside.

Tier 1
Hot block & file
LatencySub-millisecond
MediaNVMe all-flash
SLA99.99% availability

For transactional databases, AI training datasets and latency-sensitive workloads. NVMe-over-Fabrics, multi-pathing, snapshot every 15 minutes.

Tier 2
Warm object
LatencySingle-digit ms
MediaHybrid flash/HDD
SLA99.95% availability

S3-compatible object storage for application data, content delivery, and AI inference datasets. Erasure-coded for durability with intelligent tiering.

Tier 3
Capacity object
LatencyTens of ms
MediaHigh-density HDD
SLA99.9% availability

For application backups, video, logs and data lakes. Volume-class storage at the lowest cost per terabyte while maintaining 11-nines durability.

Archival as a Service

Compliance-grade
long-term retention.

Archival for retention horizons measured in decades. Write-Once-Read-Many integrity. Automated retention policies. An audit-ready chain of custody, because the auditor will ask, and the answer should be ready.

Retention
Decades, not years
Configurable retention from 7 years (RBI BFSI) through 30+ years (clinical, pharma). Hardware refresh transparent to retention horizon.
Integrity
WORM compliance
Write-Once-Read-Many guarantees enforced at the storage layer. Cryptographic chain of custody. SEC 17a-4, FINRA, RBI WORM compliant.
Sealing
Tamper-evident sealing
Each archive object cryptographically sealed at write time. Periodic re-verification with signed attestations.
Discovery
Audit-ready discovery
Indexed for compliance discovery. Full-text and metadata search across decades of archive in seconds.
Cold Data Storage

Pennies per gigabyte.
Petabytes at rest.

For the data you do not need today, and cannot afford to lose. The lowest cost per terabyte in the Indian market, with retrieval SLAs that scale from hours to minutes when you need them to.

Storage media
Tape + erasure-coded HDD
LTO-9 and LTO-10 tape libraries combined with erasure-coded HDD for the optimal cost-durability balance.
Retrieval
Minutes to hours
Multiple retrieval tiers: Standard (12 hours), Bulk (24 hours), Expedited (under 60 minutes for emergency restore).
Durability
11 nines
Annual data durability of 99.999999999%. Geographically distributed copies across HyperNext sites for disaster resilience.
Pricing
Consumption-based
Pay only for stored data, no minimum commitments. Restore fees waived for verified compliance events.
Colocation · OEM-Dedicated

Your hardware.
Our platform.

Bring the hardware you have already chosen. Dell, HPE, Lenovo, Cisco, Pure Storage, NetApp, Supermicro, or any other. We operate it. The HyperNext platform applied to your equipment. Sovereignty, observability, and SLA framework applied uniformly.

COLO / 01

Any OEM, any vendor

Customer-owned compute, storage and networking from any OEM. We do not lock you into our preferred-vendor list. We operate what you bring.

COLO / 02

Managed or unmanaged

Choose between basic colocation (space, power, cooling, connectivity) or fully managed (SOC, NOC, patching, hardware lifecycle, refresh).

COLO / 03

Full platform benefits

Even on customer hardware, you get HyperNext Digital Twin, Cybersecurity logs, BMS integration, and compliance reporting included.

COLO / 04

Density up to 660 kW

Liquid-cooling-ready halls support customer-owned racks at 120 to 660 kW AI racks. Not just standard 10 kW colocation footprints.

The HyperNext Orchestration Layer tenant console showing compute provisioning, capacity entitlement, cost and sovereignty status

The Orchestration Layer comes with every campus. Provisioning, entitlement, placement and spend in one console.

The Orchestration Layer provisioning panel: choosing IBM Power11 or HPE x86, instance size, operating system, resiliency and availability zone

Provisioning in one panel. Power11 or x86, size, operating system and resiliency, placed live against the campus.

Compliance · Built-in

Compliance as
a first-class service.

Compliance is not a feature you turn on. It is the posture you inherit. No additional configuration. No separate audit programmes. The regulator sees the same evidence we do.

Banking & Finance

RBI · SEBI · IRDAI

  • RBI Master Direction on IT GovernanceData localisation, ITOps, BCP
  • SEBI Cybersecurity FrameworkSecurities-specific cyber controls
  • IRDAI Information SecurityInsurance-sector compliance
  • PCI DSS Level 1Payment card environment
Privacy & Data Protection

DPDP · GDPR · HIPAA

  • DPDP Act 2023India's data protection framework
  • GDPR-equivalent controlsFor EU-facing workloads
  • HIPAA-alignedHealthcare data protection
  • ISO/IEC 27018PII in cloud
National Security & Critical Infrastructure

CERT-In · NCIIPC

  • CERT-In GuidelinesIndia National CERT compliance
  • NCIIPC AlignmentCritical Information Infrastructure
  • STQC Empanelment-readyGovernment data certification
  • MEITY Cloud StandardsGovernment cloud workloads
Industry-Specific

SOC · ISO · NIST

  • SOC 1 & 2 Type IIService organisation controls
  • ISO 27001 / 27017 / 27018Information security
  • NIST 800-53 & CSFFederal-grade controls
  • HITRUST CSFHealthcare-aligned
Hyper 7 · Sovereign Cloud

India's real
sovereign cloud.

Sovereignty is not one question. It is three: where the data sits, whose law governs access to it, and who holds operational control. Residency answers the first. Hyper 7 answers the other two, and then proves all three. The platform proves its own sovereignty, so you do not have to take our word for any of it.

Built on IBM
India's real sovereign cloud
Hyper 7 is built on the IBM Sovereign Cloud platform, with Red Hat OpenShift, Enterprise Linux, Red Hat AI and open APIs throughout, so your workload stays portable and can leave on your timeline.
One control plane
Compute, storage, network, recovery
All of it in a single console, with AMD EPYC and IBM Power hosts held in one inventory under one policy model. A real guest shell in the browser, with no client, no plugin and no agent.
The Orchestration Layer
Every workload, one console
Choose IBM Power11 or HPE x86, pick the size, the operating system and the resiliency, and the layer places each workload on the best-fit frame, scored live against the campus. Included at no cost, and no obligation.
Confidential computing
Sealed even from the platform
AMD SEV-SNP memory encryption keeps tenant data sealed even from the platform, with per-tenant keys across a petabyte-scale vSAN and a firewall at every workload.
You hold the keys
FIPS 140-3 Level 4
Not HyperNext, not IBM, not the host nation. Keys anchored in FIPS 140-3 Level 4 hardware. You operate the control plane; identity, access, secrets and telemetry all stay inside the sovereign boundary.
The Evidence Layer
Proof, not promises
Every operation that touches a workload is observed, attested and recorded with cryptographic integrity. Signed proof of residency, a tamper-evident audit trail, full software and AI provenance, and audit packs for RBI, SEBI, CERT-In, the DPDP Act, GDPR and the EU AI Act in minutes.
By the numbers
18min
RTO, rehearsed · 5 min RPO
99.982%
Tier IV availability, written
Indiaonly
residency on HN-1, DPDP-aligned
HN-1 banking cluster on Hyper 7 · one control plane across x86 and IBM Power

HN-1 banking cluster on Hyper 7 · one control plane across x86 and IBM Power

The Hyper 7 datacenter summary · clusters, hosts, virtual machines and confidential computing across every cluster

The Hyper 7 datacenter summary · clusters, hosts, virtual machines and confidential computing across every cluster

Explore Hyper 7 & the Evidence Layer →

HyperNext Scrub

The defensive loop
runs faster.

One design principle underneath all of it: the defensive loop must run faster than the offensive loop, and must keep running when no operator is watching. The median volumetric flood lasts between thirty-five and forty-five seconds, so a defence that waits for an analyst has already lost. Every packet is inspected inside India.

Mechanism 01
Dual-algorithm filtering
A deterministic stage handles the volumetric majority. An adaptive learning stage adjudicates the low-and-slow minority. Neither alone is sufficient.
Mechanism 02
Autonomous mitigation
Detection to clean return under sixty seconds, with the operator able to take manual control at any point rather than required to.
Mechanism 03
Attack absorption
Owned edge capacity carries the everyday band. Burst capacity handles the multi-terabit tail, and anycast splits an attack before filtering begins.
Mechanism 04
Line-rate enforcement
A packet-level datapath drops malicious traffic at the scrubbing core and re-injects clean traffic to origin, measured in packets, not only bits.
On public record
60s
detection to clean return, without a human
31.4Tbps
largest attack on record, Nov 2025
99%
of attacks remain under 1 Gbps
The Scrub operations console · live mitigation, adaptive classifier and per-flow verdicts

The Scrub operations console · live mitigation, adaptive classifier and per-flow verdicts

Cloud WAN & Drop

Every site, every cloud,
one fabric.

A software-defined wide-area network that connects your campuses, edges and cloud on-ramps as one tenant-scoped fabric, with Drop delivering disaster recovery as a service across it. Configuration, multi-site connect and recovery in a single console.

Multi-site connect
One logical fabric
Bring campuses, edge points of presence and cloud on-ramps into one tenant-scoped fabric, provisioned from a single console.
Drop
Disaster recovery as a service
Drop rides the same fabric, with orchestrated, testable failover between sites rather than a plan that has never been run.
Cloud on-ramps
Private interconnect
Direct, private interconnect to the major clouds, quoted and ordered in the console, not over email.
Edge and PoP
Managed, not just listed
Dedicated management and observability for every edge and point of presence, with their own controls, not inventory rows.
Commercial surface
Built in
Quoting, orders, billing on the 95th percentile, SLA credits and maintenance-impact analysis, all in the platform.
Compliance evidence
Carried on every link
Every interconnect carries the residency and audit evidence the sovereign platform is built on.
Built in
95th
percentile, usage-based billing
Anymetro
global site catalogue, exact coordinates
WrittenSLA
credits, automatic
The HyperNext Cloud WAN Controller showing fabric topology across India at true coordinates, DCI and backbone corridors, protection groups and SLA attainment by class

The Cloud WAN Controller · fabric topology, DCI and backbone corridors, and protection groups, live across India

BMS & Digital Twin

It reads the fluid as
it flows past.

The building management system is ours, written in-house and wired to the plant. Coolant is changed on condition, not on a calendar, because an inline valve reads it as it flows and projects the life it has left. A rack-level digital twin runs alongside the physical campus, and every availability commitment is watched live and backed by service credits.

Reads fluid as it flows
No sample bottles
Temperature in and out, delta T, flow, density, glycol concentration, purity, pH, inhibitor reserve and conductivity, all read live as the coolant moves. No sample bottles and no trip to a lab.
Changed on condition
Not on a calendar
An inline valve reads the coolant as it flows past and works out how many days of life it has left. Two valves per loop, on the inlet and the outlet, wired straight into the BMS we wrote.
Sealed, dry cooling
Zero on-site cooling water
Sealed propylene-glycol loops and dry coolers, with no evaporative stage anywhere in the design, so the water a data centre uses to cool itself is effectively zero.
Predictive, not reactive
Before it becomes downtime
Asset health and root-cause analytics flag risk before it becomes downtime, watched around the clock per tenant from our own NOC.
3D digital twin
Rack-level
A rack-level digital twin runs alongside the physical data centre, for what-if and SLA simulation.
A credit-backed SLA
Held to it
Miss an SLA target and service credits apply automatically. The commitment carries financial weight rather than sitting in a contract as a sentence.
Live on the BMS
1,200+
days projected coolant life
0litres
on-site cooling water consumption
1.30
design PUE average, band 1.25 to 1.35
Building 1, PGW25 loop · live sensing, fluid-life projection, sampled colour mapped to condition

Building 1, PGW25 loop · live sensing, fluid-life projection, sampled colour mapped to condition

Per-tenant uptime and root-cause analytics on the HyperNext BMS, watched live from our own NOC

Per-tenant uptime and root-cause analytics on the HyperNext BMS, watched live from our own NOC

Assurance

Engineered to
the benchmarks.

Every layer is built to be checked. We publish the engineering behind each of these, and certification audits are scheduled against each facility's commissioning timeline. Uptime Institute Tier III and Tier IV. ISO/IEC 27001, 27017 and 27018. SOC 1 and SOC 2 Type II. RBI, SEBI and IRDAI for BFSI; CERT-In and NCIIPC for government and defence. Write to [email protected] for signed policies, or ask for the paper behind whichever claim you would like to test.

Talk to Services

Ready to scope a service?

Tell us about the workloads, the compliance posture, and the timeline. We will respond with a scoping document and indicative pricing within five working days.